Imaging TOP (iTOP) Detector Readout

iTOP logo

Local Members

Matt Andrew, Matt Barrett, Tom Browder, Shawn Dubey, Michael Jones, Brian Kirby,
  Isar Mostafanezhad,
Luca Macchiarulo, Marc Rosen, Xiaowen Shi,  Gary Varner
 


KEK TOP Module Operations: [link]

Introduction to iTOP Front-End Readout System

ASIC Carrier standalone testing

Board Stack laser testing

SCROD testing

Map of Cables and MCP-PMT Channels of iTOP Modules

Composition of Board Stacks

IRSX ASIC SSTOut Feed Back Values


iTOP Calibration Master Module:  [link]

indico page for local iTOP meetings


Most current WBS 1.3 Costing    (JAN-2015)
Scheduling: 
iTOP Previous Hot Items (e.g. CD-1, CDR, Peer Review; FNAL 2011 beam test)

Fuji Hall (equip list, schedule, mechanics) [Hayakawa-san's modified version]  [TWiki page]     [CRT Elog]


F2 layout Diagram  [pdf]
LEPS IRS3B Data Analysis Task list  [link]
LEPS/local analysis:  [twiki link]   [
iTOP/IRS3 Elog]
IRS3B (w/LEPS data) available:  [link]
HV/Front board links (from Gerard):  [HVB link]   [Front link]

Mechatronics Reference (30-SEP-2013)  [link]
Working Group Meeting @ SLAC (28-SEP-2013)  [link]

Weekly meetings now being archived on Indico  (rest kept here as repository)

15-APR-2014 --
  Local iTOP meeting (Tuesday @ 2pm)

To allow easier upload of files, agenda/items to show have been moved for recent meetings to physics Indico page.



4-MAR-2014 --  Local iTOP meeting (Tuesday @ 2pm)
  1. CD-2/3 Presentation Preparations  (Gary/Brian/Tom)
    1. Posted Introductory talk?  (Tom)
    2. Revised slides needed for Session 1A-2  (Matt B, all testing)
    3. Simple KLM readout plot for Session 1B-1?  (Brian)
    4. Intermediate board stack result for Session 1B-2  (all testing)
  2. Follow-ups from last week
    1. HV ordering status?  (Brian)
    2. Revised laser test set-up  (Brian/Matt A/Shawn)
    3. Assembly fixture, other mechanicals update  (Marc)
    4. Check-lists to post (work from):
      1. prior to qualifying Intermediate, integrated board stacks
      2. prior to 2x4 PMT scanning
      3. for CRT operation (need to re-machine bar-box extension for FNAL prototype)
    5. Initial discussions on T-518 preparation -- ball still in Gary's court
  3. Analysis Updates ?  (all)
  4. AOB?

25-FEB-2014 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Testing Schedule Update  (Matt A)
    1. Side spacers from Cincinnati (how many?)  [these are production only? -- needed items for Intermed testing/CRT?]  (Matt A)
    2. HV ordering status?  (Brian)
    3. Revised laser test set-up  (Brian/Matt A/Shawn)
    4. Assembly fixture update  (Marc)
    5. Check-lists to post (work from):
      1. prior to qualifying Intermediate, integrated board stacks
      2. prior to 2x4 PMT scanning
      3. for CRT operation (need to re-machine bar-box extension for FNAL prototype)
    6. Initial discussions on T-518 preparation
  2. Analysis Updates ?  (all)
  3. What to present at tomorrow's bPID meeting?
  4. AOB?

18-FEB-2014 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Testing Schedule Update  (Brian/Matt A)
    1. HV ordering status?  (Brian)
    2. Revised laser test set-up  (Brian/Matt A/Shawn)
    3. Assembly fixture  [pdf]  discussion  (Marc)
    4. Check-list prior to qualifying Intermediate, integrated board stacks
    5. Check-list prior to 2x4 PMT scanning
    6. Check-list for CRT operation (need to re-machine bar-box extension for FNAL prototype)
    7. Initial discussions on T-518 preparation
  2. Analysis Updates ?  (all)
  3. What to present at tomorrow's bPID meeting?
  4. AOB?

21-JAN-2014 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Next stage testing Schedule Update  (Brian/Matt A)
    1. HV ordering status?
    2. Revised laser test set-up
    3. Check-list prior to qualifying Intermediate, integrated board stacks
    4. Check-list prior to 2x4 PMT scanning
    5. Check-list for CRT operation (need to re-machine bar-box extension for FNAL prototype)
  2. Electro-mechanical Board-stack Update  (Marc/Matt)
  3. Action items from mini-Review/for upcoming BPAC  (Gary)
    1. Quantifying effectiveness of timebase feedback [data in hand]
    2. "Recovering" saturated pulse data and demonstration of timing thus achieved
    3. Codify a set of ASIC, Carrier, SCROD and full board-stack test/qualification procedures [needed]
  4. Analysis Updates ?  (all)
  5. What to present at tomorrow's bPID meeting?
  6. AOB?


7-JAN-2014 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Hardware/firmware/test Schedule Update  (Brian/Matt A)
  2. Electro-mechanical Board-stack Update  (Marc/Matt)
  3. Action items from mini-Review and beyond  (Gary, all)
    1. Quantifying effectiveness of timebase feedback [data in hand]
    2. "Recovering" saturated pulse data and demonstration of timing thus achieved
    3. Fine position (narrow laser beam) gain scan [variable amps needed?]
    4. Codify a set of ASIC, Carrier, SCROD and full board-stack test/qualification procedures
  4. Director's Review Presentation preparations (all)
    1. Status of WBS1.03 Cost Book
    2. Viability of IRS3C for initial Production ?
  5. Analysis Updates ?  (all)
  6. AOB?


17-DEC-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Hardware/firmware/test Schedule Update  (Brian/Matt A)
  2. Electro-mechanical Board-stack Update  (Marc/Matt)
  3. Data-based feedback update  (Bostjan)
  4. Plans for "production" board stack testing and task sharing  (Brian)
  5. Brief status update on software/MC  (Matt B)
  6. Director's Review Presentation preparations (all)
  7. AOB?


26-NOV-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Hardware/firmware/test Schedule Update  (Brian/Bostjan/Matt A)
  2. Electro-mechanical (machining/parts assy for Mini-Review) Update  (Marc/Matt)
  3. Mini-Review Presentation preparations (all)
  4. AOB?

5-NOV-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Hardware/firmware/test Schedule Update  (Brian/Bostjan/Matt A)
  2. Status of testing   (Bostjan, Brian, all)
    1. "production" Rev. C testing
    2. additional HV
    3. laser test station plans
  3. Mechanics (machining) Update  (Marc)
  4. Boardstack Update  (Matt A carrier revD; SCROD fake revB[mechatronics reference]
  5. Analysis updates/plans  (all)
  6. Discussion on what to present tomorrow  (Gary, all)
  7. AOB?

15-OCT-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Hardware/firmware/test Schedule Update  (Brian/Bostjan/Matt A)
  2. Additional HV, mechanics for next round laser testing  (Brian, all)
  3. Mechanics (machining) Update  (Marc)
  4. Boardstack Update  (Matt A)  [reference link]
  5. Analysis updates/plans  (all)
  6. Discussion on what to present tomorrow  (Gary, all)
  7. AOB?

8-OCT-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Schedule Update  (all)
  2. Cooling issues for laser testing  (Marc, all)
  3. Mechanics (machining) follow-up  (Marc)
  4. Boardstack plans  (Matt A)
  5. Analysis updates/plans?  (all)
  6. Discussion on what to present tomorrow  (Gary, all)
  7. AOB?

1-OCT-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Review Material from Reviews at SLAC  (Gary)
  2. Mechanics (machining) follow-up  (Marc)
  3. Short-term boardstack plans  (Matt A)
  4. Draft Schedule Presentation [initially for Wednesday, to be refined for EB]  (Gary]

30-SEP-2013 --  Global/Local iTOP analysis meeting (Monday @ 2pm)
  1. Global LEPS analysis call-in  (Matt B lead)
  2. Brief software meeting summary, status of MC for beam test and CRT  (Matt B)
  3. Testing/Analysis updates  (round-table)
  4. Next testing plans (Carrier02, Rev. C)  (Bostjan/Gary)
  5. AOB ?

24-SEP-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Review Information on Engineering Issues  (Gary)
  2. Mechanics (machining) follow-up  (Marc)
  3. Testing/Analysis updates  (round-table)
  4. IRSX Review preparations  (Gary)
  5. AOB ?
20-SEP-2013 --  Engineering Issues follow-ups
  1. MCP-PMT related:
  2. HV/front board electro-mechanics  (PNNL for Gerard)
  3. Board stack

17-SEP-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Mechanics for Rev C board stack machining/cooling [Gary/Marc] 
  2. Revised fiber transceiver/cable routing diagrams [pdf]
  3. What to present tomorrow?
  4. Schedule update  [for discussion Wednesday]
  5. Design Reviews @ SLAC [Sept 27, 28]
  6. AOB?

3-SEP-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. BPAC presentation preparations (all)
  2. Any analysis updates [new]?
  3. Revised board schedule (when next CRT/beam test ops?)
  4. Pointers to getting started with beamtest MC in basf2, including beta resolution  (Marko S.)
  5. Table to find better optical matching compounds for PMT coupling  [xls]   (Jim F.)
  6. AOB?

20-AUG-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Improved Dark Box/Mechanics/cooling for next stage testing (all)
  2. Any analysis updates [new]?
  3. Revised Analysis Schedule  (Brian)
  4. Coordinating local analysis efforts, follow-up:
    1. Status/plans for efficiency scans ?  (Bostjan/Brian)
    2. Timing studies remaining board stacks  (Brian)
    3. "High Current Event" testing discussion  (all)
    4. Coordinating shifts to muscle through measurements  (all?)
    5. Timing/efficiency measurements modified boards  (few channels?)
    6. Timing/efficiency studies for c02 Rev. C  (boards back "next week")
  5. What to present bPID tomorrow?  (all)
  6. Revised Fabrication Schedule/WBS  (Matt A/Gary)
  7. AOB ?

23-JUL-2013 --  Local iTOP meeting (Tuesday @ 2pm)
  1. Review of  [Action Items]  from Dedicated E-O-M meeting @ VT 3-JUL-2013
  2. Reminder:  dedicated analysis meeting (Monday @ 2pm)  [updates here]
  3. Agenda items for Wednesday:

16-JUL-2013 --  Local iTOP meeting
  1. Dedicated analysis meeting (Monday @ 2pm) Laser setup tests
  2. Agenda to be updated subsequently
24-JUN-2013 / 1-JUL-2013 --  iTOP meeting  (deferred)
  1. Focus on data analysis/laser scan set-up  (all)
  2. B2GM preparations
17-JUN-2013 --  iTOP meeting  (2-3pm)
  1. Preparations for B2GM/Dedicated meeting  (all)
  2. Local preparation for laser timing data for board stacks  (Bostjan, Brian, Matt A)
  3. Brief summary of Software meeting  (Matt B)
  4. Analysis plans/coverage discussion/coordination (Brian -- updated)
  5. Input to the TDR/other documents  (all -- defer at this point?)

  6. AOB?

29-APR-2013 --  iTOP meeting  (2-3pm)
  1. Update from Fuji Hall  (Brian)
  2. Brief summary of Software meeting  (Matt B)
  3. CRT, other data analysis  (Mike, all)
  4. Status of data taking in Hawaii, plans  (Matt A, all)
  5. LEPS laser analysis update [txt]  (Mike)
  6. LEPS (SPring-8) beam test June 1 [4] - 14   [schedule page]   [details on fill modes]
  7. AOB?

15-APR-2013 --  iTOP meeting  (2-3pm)
  1. Call into Gemba   (Brian/Matt A)
  2. Brief summary of Software meeting  (Matt B)
  3. CRT data analysis  (Mike)
  4. Discussion on priorities  (all)
  5. LEPS (SPring-8) beam test May 9 - 18  [schedule page]   [details on fill modes]
  6. Data locations:  
  7. AOB?

8-APR-2013 --  iTOP meeting  (2-3pm)
  1. Call into Gemba   (Brian/Matt A)
  2. Mechanical preparations/planning  (Marc + ...)
  3. CRT analysis of Elog 95 data  [plot]   (Mike)
  4. Manpower/schedule discussion
  5. AOB?

1-APR-2013 --  iTOP meeting  (2-3pm)
  1. Call into Gemba   (Brian/Matt A)
  2. Brief  Software meeting summary  (Matt B)
  3. LEPS data analysis  (Mike) -- deferred
  4. Manpower/schedule discussion
  5. AOB?

18-MAR-2013 --  iTOP meeting  (2-3pm)
  1. Call into Gemba   (Matt B)
  2. Schedule Update   (Brian K)
  3. LEPS data analysis  (Mike)
  4. Regular Updates:
    1. IRS3B/electronics Testing Update/plans   (Gary)
    2. Mechanics updates   (Marc)
    3. Sci-Fi Tracker -- update from Fuji hall  (Brian K)
    4. Calibration laser test plans  (Bostjan/Matt A/Gary)
  5. Note:  (this week!)  iTOP Final Electro-mechanical Packaging Task Force [Workshop] (March 20-21, ID Lab)
  6. LEPS (SPring-8) beam test May 9 - 18  [schedule page]   [details on fill modes]
  7. AOB?

25-FEB-2013 -- continuing into B2GM 4/5-MAR-2013  iTOP meeting  (2-3pm)
  1. Software meeting summary  (Matt B)
  2. LEPS data analysis  (Mike)
  3. There will not be a bPID meeting Wednesday (next week is B2GM):
    1. IRS3B/electronics Testing Update   (Gary)
    2. Mechanics updates   (Marc)
    3. Sci-Fi Tracker -- update from Fuji hall
    4. Calibration Laser system update (6-MAR-2013) -- difficulties of initial concept identified (Bostjan)
    5. TOP TWiki update/presentation  (Bostjan)
  4. Scheduling update for CRT work  [link]
  5. iTOP Final Electro-mechanical Packaging Task Force [Workshop] (March 20-21, ID Lab)
  6. LEPS (SPring-8) beam test May 9 - 18  [schedule page]   [details on fill modes]
  7. AOB?

11-FEB-2013  iTOP meeting  (2-3pm)
  1. Software meeting summary  (Matt B)
  2. LEPS data analysis  (Mike)
  3. There will not be bPID Wednesday (but next Monday is a holiday):
    1. IRS3B/electronics Testing Update   (Gary)  [20feb morning TOP presentation]
    2. Mechanics  [diagram]  (Marc)
    3. Board Stack  [schedule]   (Matt A) 
    4. Sci-Fi Tracker   (Brian K) [link]
    5. Calibration Laser system update (Bostjan) [link]
    6. CRT Data Rate/volume Estimates  [pdf]   [xls]    (Gary)
  4. Scheduling update for CRT work  [link]
  5. iTOP Final Electro-mechanical Packaging Task Force [Workshop] (March 20-21, ID Lab)
  6. AOB?

4-FEB-2013  iTOP meeting  (2-3pm)
  1. Report on Fuji Hall CRT progress (Gary)
  2. Software meeting summary  (Matt B)
  3. LEPS data analysis  (Mike)
  4. There will be bPID Wednesday meeting:
    1. IRS3B/electronics Testing Update  [draft]   (Gary)
    2. Mechanics  (Marc)
    3. Board Stack  [schedule]   (Matt A) 
    4. Sci-Fi Tracker   (Brian K) [link]
    5. Calibration Laser system [concept]  (Gary)
  5. Scheduling update for CRT work  [link]
  6. AOB?

28-JAN-2013  iTOP meeting  (2-3pm)
  1. Report from bPID/EB/Fuji Hall (Gary)
  2. Software meeting summary  (Matt B)
  3. Summary on LEPS data analysis  (Mike)
  4. Next bPID Wednesday meeting deferred until Feb 6, but local updates anyway:
    1. IRS3B Testing Update (Gary)
    2. Mechanics  (Marc)
    3. Board Stack  (Matt A)
    4. Sci-Fi Tracker   (Brian K)
    5. Calibration Laser system  (Gary)
    6. Other information?
  5. Continued Scheduling discussion for CRT work (travel dates fixed?)
  6. AOB?

18-JAN-2013  Firmware meeting with SLAC  (11am)
  1. CTA-related items
  2. Belle II related items (Kurtis and Luca will join)       

- Current firmware repository for the IRS2 version of the board stack
http://idlab-scrod.googlecode.com
svn path: svn/SCROD-boardstack/new_daq_interface
*some instructions still coming to deal with a couple compile "features"
**note that this includes schematics for various boards here:
https://code.google.com/p/idlab-scrod/downloads/list

- Data formats for this version of the firmware:
http://www.phys.hawaii.edu/~kurtisn/doku.php?id=itop:documentation:data_format

- Schematics for the IRS3B version of the carrier levels 0 and 2
http://www.phys.hawaii.edu/~mza/PCB/iTOP/carriers/carrier02.revB.schematic.pdf


14-JAN-2013  iTOP meeting  (2-3pm)
  1. Intro -- Bostjan Macek (will be in?)
  2. Software meeting summary  (Matt B)
  3. Updates from Japan  (Tom)
  4. Updates on LEPS data analysis  (Mike)
  5. Updates for this week's morning bPID:
    1. IRS3B Testing Update (Gary)
    2. Mechanics  (Marc)
    3. Board Stack  (Matt A)
    4. Sci-Fi Tracker   (Brian K)
    5. Other information?
  6. Preparations for the TrgDAQ meeting next week (Brian will run meeting?)
  7. Continued Scheduling discussion for CRT work
  8. AOB?

7-JAN-2013  iTOP meeting  (2-3pm)
  1. Software meeting summary  (Matt B)
  2. Updates on LEPS data analysis  (Mike)
  3. Updates for this week's morning bPID:
    1. IRS3B Testing [Draft]  (Gary)
    2. Mechanics  (Marc)
    3. Summary of Board Stack status/schedule  -   status of carrier boards  (Matt A)
    4. Sci-Fi Tracker schedule update  (Brian K)
    5. LEPs data analysis  (Mike)
  4. Continued Scheduling discussion for CRT work (pushing into February)
  5. AOB?


10-DEC-2012  iTOP meeting  (2-3pm) Summary
  1. Software meeting summary  (Matt B)
  2. Updates:
    1. Mechanics  (Marc)
    2. Summary of Fuji Hall work  (Matt A)
    3. Sci-Fi Tracker schedule update  (Brian K)
    4. LEPs data analysis  (Mike)
  3. Continued Scheduling discussion for autumn/winter CRT work (pushing into January)
  4. AOB?

3-DEC-2012  iTOP meeting  (2-3pm)
  1. Software meeting summary  (Matt B)
  2. Updates:
    1. Mechanics  (Marc)
      1. Thermal/mechanical housing/mock-up plans & schedule
      2. Laser calibration system design specifications (simple diffuser/quartz block test?)
      3. Comment on (inverted) assembly/lift stage
    2. Readout/news from Fuji Hall (Kurtis/Matt A)
    3. Analysis of LEPS data Exp. 1&2 and description (Mike)
    4. Carrier update:  [schematics] and comments thereon  as well as mentioned .ucf  (Matt A)
    5. HV (first module received), as well as comments on use  and mechanical notes  (Gerard)
    6. Sci-Fi Tracker schedule update  (Brian K)
  3. Continued Scheduling discussion for autumn/winter CRT work (pushing into January)
      1. Matt A 11/18-12/9; Kurtis 11/17-12/7;
      2. Plans for testing with what will be available.
  4. AOB?

26-NOV-2012  iTOP meeting  (2-3pm)
  1. Software meeting summary  (Matt B)
  2. Updates from KEK:
    1. Mechanics  (Marc)
      1. Comments on Jim Fast's horseshoe/module concept
      2. Wedge mechanical dimensions
      3. Thermal/mechanical housing/mock-up plans & schedule
      4. Laser calibration system design specifications (simple diffuser/quartz block test?)
    2. Readout (Kurtis/Matt A)
  3. Regular updates (what to present @ morning PID) ?
    1. Analysis of LEPS data and description (Mike)
    2. Carrier update?  (Matt A)
    3. IRS3B Testing  (Gary)
    4. Sci-Fi Tracker schedule update  (Brian K)
  4. Continued Scheduling discussion for autumn/winter CRT work (pushing into January)
      1. Matt A 11/18-12/9; Kurtis 11/17-12/7;
      2. Plans for testing with what will be available.
  5. AOB?

19-NOV-2012  iTOP meeting  (2-3pm)
  1. Updates from KEK
    1. Mechanics  (Marc)
      1. CRT Slider mech reference
    2. Readout (Kurtis/Matt A)
  2. Regular updates
    1. Analysis of LEPS data and description (Mike)
    2. Carrier update?  (Matt A)
    3. Sci-Fi Tracker schedule update  (Brian K)
  3. Continued Scheduling discussion for autumn/winter CRT work (pushing into January)
      1. Matt A 11/18-12/9; Kurtis 11/17-12/7;  Marc 11/15-11/21
      2. Plans for testing with what will be available.
  4. AOB?

05-NOV-2012  iTOP meeting  (2-3pm) 

Draft B2GM TOP Electronics presentation

  1. Software meeting summary  (Matt B)
  2. Regular updates
    1. Analysis of LEPS data (Mike)
    2. Scheduling update on Cosmic Ray Test stand at Fuji Hall (revised 29-oct-2012)
    3. Carrier update?
    4. HV testing underway at Indiana
    5. Sci-Fi Tracker schedule update
  3. Requests/coordination for iTOP B2GM talks
  4. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "in conjunction with B2GM"
      2. Gary:  11/2 - 11/18;  Matt A 11/18-12/9; Kurtis 11/17-12/7;  Matt B. 11/10-11/23; Tom 11/11-11/18; Marc 11/15-11/21
      3. Items for Matt B. or Tom bring for Gary
      4. Plans for testing with what will be available.
      5. Others to be decided:  Brian K(?)
  5. AOB?

29-OCT-2012  iTOP meeting  (2-3pm)

  1. Software meeting summary  (Matt B)
  2. US Hardware/Firmware meeting summary  (Brian)
  3. Regular updates -- in preparation for Wednesday meeting
    1. Analysis of LEPS data (Mike)
    2. Scheduling update on Cosmic Ray Test stand at Fuji Hall (revised 29-oct-2012)
  4. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "in conjunction with B2GM"
      2. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7; 
      3. Plans for testing with what will be available.
      4. Others to be decided:  Marc, Brian K(?), Matt B(?), Tom(?)
  5. AOB?

22-OCT-2012  iTOP meeting  (2-3pm)

  1. Software meeting summary  (Matt B) 
  2. Draft Firmware Self-Review (Kurtis)
  3. Regular updates -- in preparation for Wednesday meeting:  [electronics draft]
    1. Analysis of LEPS data (Mike)
    2. Scheduling update on Cosmic Ray Test stand at Fuji Hall (revised 23-oct-2012)
  4. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "in conjunction with B2GM"
      2. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7; 
      3. Plans for testing with what will be available.
      4. Others to be decided:  Marc, Brian K(?), Matt B(?), Tom(?)
  5. AOB?

15-OCT-2012  iTOP meeting  (2-3pm)

  1. Software meeting summary  (Matt B) 
  2. Scheduling update (Kurtis/Gary/Matt A)
  3. LEPS run redux  (Matt B)
  4. Regular updates -- in preparation for Wednesday meeting:  [electronics draft]
    1. Analysis of LEPS data (Mike)
    2. Update on Cosmic Ray Test stand at Fuji Hall
  5. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "in conjunction with B2GM"  (will mechanics be ready??)
      2. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7; 
      3. Will CRT mechanics be ready??
      4. Others to be decided:  Marc, Brian K(?), Matt B(?), Tom(?)
  6. AOB?

8-OCT-2012  iTOP meeting  (2-3pm) 

  1. Feedback from Special BPAC Review (Oct. 1-2 @ KEK)   (Gary)
  2. Software meeting summary?  (Matt B away at LEPS, though meeting to be held this morning) 
  3. LEPS run status  (Matt B)
  4. Regular updates:
    1. Updates on FNAL studies [txt]  (Mike)
    2. Update on Cosmic Ray Test stand at Fuji Hall
  5. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "in conjunction with B2GM"
      2. Working schedule/costs with Indiana for HV part of board stack
      3. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7; 
      4. Others to be decided:  Marc, Brian K(?), Matt B(?), Tom(?)
  6. TARGET6 Design Review, Belle II Firmware @ SLAC  Friday, Oct. 12, 2012
  7. AOB?

24-SEP-2012  iTOP meeting  (2-3pm) 

  1. Brief software meeting summary (Matt B) 
  2. Regular updates:
    1. Updates on studies  (Mike)
    2. Update on Cosmic Running at Fuji Hall
    3. US Hardware/Firmware meeting this Friday
    4. Oct. 2-9 LEPS run status?
    5. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "in conjunction with B2GM"
      2. Working schedule/costs with Indiana for HV part of board stack
      3. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7; 
      4. Others to be decided:  Marc, Brian K(?), Matt B(?), Tom(?)
  3. Preparations for upcoming Reviews:
    1. Belle II Focused Review (PXD, PID)  Oct. 1-2 @ KEK
    2. Manpower meeting at KEK 9/30 
  4. AOB?

17-SEP-2012  iTOP meeting  (3-4pm) 

  1. Brief software meeting summary (Matt B) 
  2. Regular updates:
    1. Updates on studies  (Mike)
    2. Update on Cosmic Running at Fuji Hall
    3. Oct. 2-9 LEPS run status?
    4. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "in conjunction with B2GM?"
      2. Working schedule/costs with Indiana for HV part of board stack
      3. Matt A away a bit longer...
      4. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7; 
      5. Others to be decided:  Marc, Brian K(?), Matt B(?), Tom(?)
  3. Preparations for upcoming Reviews:
    1. Belle II Focused Review (PXD, PID)  Oct. 1-2 @ KEK
    2. Really no other reviews this calendar year?? 
  4. AOB?

10-SEP-2012  iTOP meeting  (3-4pm) 

  1. Software meeting summary (Matt B) 
  2. bPID: preparations for this week's mechanical meeting (Tuesday meeting slot?)
  3. Regular updates:
    1. Updates on studies -- deferred as Mike is out (Mike)
    2. Update on Cosmic Running at Fuji Hall
    3. Oct. 2-9 LEPS run status?
    4. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "in conjunction with B2GM?"
      2. Working schedule/costs with Indiana for HV part of board stack
      3. Matt A away a bit longer...
      4. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7; 
      5. Others to be decided:  Marc, Brian K(?), Matt B(?), Tom(?)
  4. Preparations for upcoming Reviews:
    1. Belle II Focused Review (PXD, PID)  Oct. 1-2 @ KEK
    2. Really no other reviews this calendar year?? 
  5. AOB?

20-AUG-2012  iTOP meeting  (3-4pm) 

  1. Software meeting summary (Matt B) 
  2. bPID: preparations for this week's meeting
    1. Updates on studies (Mike)
    2. Update on Cosmic Running at Fuji Hall
    3. Oct. 2-9 LEPS run status?
    4. Continued Scheduling discussion for autumn/winter CRT work
      1. Dedicated mechanical/working meeting in Fuji hall --> "after LEPS run"
      2. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7; 
      3. Others to be decided:  Marc, Brian K(?), Matt B(?), Tom(?)
    5. SLAC Beam Test option (request)  (Gary -- Kurtis to present on Wednesday?)
  3. Preparations for upcoming Reviews:
    1. ESTB First meeting -- 23-AUG-2012 (this Thursday)
    2. ANL System Review -- 24-AUG-2012 (this Friday!!)
    3. Belle II Focused Review (PXD, PID)  Oct. 1-2 @ KEK
  4. AOB?

13-AUG-2012  iTOP meeting  (3-4pm) 

  1. Software meeting summary (Matt B) 
  2. bPID: no meeting this week
    1. Updates on studies (Mike)
    2. Mechanics/readout/commissioning for  Cosmic Running at Fuji Hall
    3. Participation in Oct. 2-9 LEPS run  (Tom?  Matt B)
    4. Schedules for autumn CRT work
      1. Dedicated mechanical/working meeting in Fuji hall (end of August/early Sept) --> "after LEPS run"
      2. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7;  Brian K(?), Matt B(?)
  3. Preparations for upcoming Reviews:
    1. ANL System Review -- 24-AUG-2012 (next Friday!!)
    2. Belle II Focused Review (PXD, PID)  Oct. 1-2 @ KEK
  4. Updates?
    1. Update on Rev. A2 board-stack for CRT  (Matt A)
    2. Update on firmware development plans [fDIRC] (Matt A/Gary)
    3. Plans for declaring T-1019 data analysis ??  (news from PNNL?)
  5. AOB?

6-AUG-2012  iTOP meeting  (3-4pm) 

  1. Software meeting summary (Matt B) 
  2. bPID meeting this week -- material to present
    1. Updates on studies (Mike)
    2. Mechanics for  Cosmic Running at Fuji Hall
    3. Dedicated Mechanics Meeting
    4. Participation in Oct. 2-9 LEPS run  (Matt B)  [next time]
    5. Schedules for autumn CRT work
      1. Dedicated mechanical/working meeting in Fuji hall (end of August/early Sept) --> "after LEPS run"
      2. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7;  Brian K(?), Matt B(?)
  3. Preparations for upcoming Reviews:
    1. ANL System Review (dates TBD -- doodle poll, awaiting ANL confirmation)
    2. Belle II Focused Review (PXD, PID)  Oct. 1-2 @ KEK
  4. Deferred?
    1. Update on Rev. A2 board-stack for CRT  (Matt A)
    2. Update on firmware development plans [fDIRC] (Kurtis)
    3. Plans for T-1019 data reprocessing ??  (news from PNNL?)
  5. AOB?

30-JUL-2012  iTOP meeting  (3-4pm) 

  1. Next Software meeting is 2-3pm Monday, August 6th (Matt B) 
  2. Feedback from Trg/DAQ, B2GM  (Gary)
    1. Commissioning schedule discussion  [PDF]
    2. Technical issues   [PDF]
    3. Schedule  [PDF]
  3. bPID meeting this week -- material to present
    1. Updates on studies (Mike)
    2. Mechanics for  Cosmic Running at Fuji Hall
    3. Dedicated Mechanics Meeting
    4. Status of Rev. A2 board-stack for CRT  (Matt A)
    5. Participation in Oct. 2-9 LEPS run  (Matt B)  [next time]
    6. Schedules for autumn CRT work
      1. Dedicated mechanical/working meeting in Fuji hall (end of August/early Sept)?
      2. Gary:  Nov. 2 - 18;  Matt A Nov. 11/10-30; Kurtis 11/16-12/7;  Brian K(?), Matt B(?)
  4. Preparations for upcoming Reviews:
    1. ANL System Review (dates TBD -- doodle poll)
    2. Belle II Focused Review (PXD, PID)  Oct. 1-2 @ KEK
  5. Deferred:
    1. Update on firmware development plans [fDIRC] (Kurtis)
    2. Plans for T-1019 data reprocessing ??
  6. AOB?

25-JUN-2012  iTOP meeting  (3-4pm) 

  1. 2-3 pm is Software meeting  (Matt B) 
  2. Revised CD-1 Review date ("tomorrow!!"  Tuesday, June 26,  2012)
    1. Status and preparation
    2. Material into breakout slides (for discussion -- 2.5 hours for "everything")
  3. bPID meeting this week -- material to present
    1. Updates on studies (Mike)
    2. Mechanics for  Cosmic Running at Fuji Hall  (Marc)
    3. Dedicated Mechanics Meeting?
    4. Update on bench test measurements (Kurtis)
    5. Reprocessed data analysis for T-1019; strategy & status??  (all)
    6. IRS3B Design Review (15-JUN-2012) and Submission (18-JUN-2012)Tape-out (25-JUN-2012)  [link]
      1. Summary of Review  [link]
      2. Discussion of plans
        • Evaluating external timebase PLL/DLL circuit
        • Prep IRS3B eval board prior to arrival of IRS3B
        • Improvements to HV power:  possible active circuit for SL-10 (Gerard -- 21-JUN-2012)  [PDF]
        • And some follow-on questions
    7. Plans for upgraded electronics/commissioning @ KEK:
  4. Preparations for upcoming B2GM Meetings
  5. AOB?

21-MAY-2012  iTOP meeting  (3-4pm) 

timing

  1. 2-3 pm is Software meeting  (Matt B) 
  2. Revised date for CD-1 ("late June"  2012)
    1. Practice call tomorrow (management predominantly...)
    2. Material into breakout slides (for discussion -- 2.5 hours for "everything")
  3. bPID meeting this week -- material to present
    1. Updates on studies (Mike)
    2. Mechanics for  Cosmic Running at Fuji Hall  (Marc)
    3. Update on bench test measurements (Kurtis)
    4. Reprocessed data analysis for T-1019; end of May deadline?  (all)
    5. Plans for upgraded electronics/commissioning @ KEK:
  4. Future:
    1. Another beam test...
  5. AOB?

7-MAY-2012  iTOP meeting  (3-4pm)

  1. 2-3 pm is Software meeting  (Matt B)  [Gary @ Mike Cooney Oral exam]
  2. Items to prepare for upcoming CD-1 (31-MAY-2012) -- WAS DUE FRIDAY (as is DOE Renewal...)
    1. Revised CDR (incorporate appendix material, one new measurement)
    2. Material into breakout slides (for discussion -- 2.5 hours for "everything")
  3. bPID meeting this week -- material to present
    1. Updates on studies (Mike)
    2. Mechanics for  Cosmic Running at Fuji Hall  (Marc)
    3. Update on bench test measurements (Kurtis)
    4. Reprocessed data analysis for T-1019; end of May deadline  (all)
    5. Plans for upgraded electronics/commissioning @ KEK:
  4. Future:
    1. Cosmic Ray test schedule
    2. Another beam test...
  5. AOB?

30-APR-2012  iTOP meeting  (3-4pm)

  1. 2-3 pm is Software meeting  (Matt B)
  2. Mechanical Engineering/Integrated Module preparation for upcoming CD-1 (31-MAY-2012)
    1. SCROD Rev B/board-stack 3D mechanics  (Matt A)
    2. Board stack for breakout?
  3. No bPID meeting this week (Nagoya @ LEPS/Golden Week)
    1. Nphoton studies [30-APR-2012 edition] (Mike)
    2. Mechanics for  Cosmic Running at Fuji Hall  (Marc)
    3. Update on bench test measurements (Kurtis)
    4. Reprocessed data analysis for T-1019; end of May deadline  (all)
    5. Further discussion on schedule for upgraded electronics/commissioning @ KEK in "summer"
  4. Future:
    1. Cosmic Ray test schedule
    2. Another beam test...
  5. AOB?

23-APR-2012  iTOP meeting  (3-4pm)

  1. 2-3 pm is Software meeting  (Matt B)
  2. Mechanical Engineering/Integrated Module preparation for upcoming CD-1 (mid-May)
    1. SCROD Rev B/board-stack 3D mechanics  (Matt A)
    2. Thermal modelling plans ?
  3. No bPID meeting this week (Nagoya @ LEPS) -- local updates
    1. Summary of studies (Mike)
    2. Mechanics for  Cosmic Running at Fuji Hall  (Marc)
    3. Update on bench test measurements (Kurtis)
    4. Schedule for upgraded electronics/commissioning @ KEK in "summer"
  4. CDR updates  (Gary/Tom/Kurtis)
  5. Future:
    1. Major push on beam test data analysis/additional cosmic running
    2. Cosmic Ray test schedule
    3. Another beam test...
  6. AOB?

9-APR-2012  iTOP meeting  (3-4pm) -- note new time

  1. 2-3 pm is Software meeting  (Matt B)
  2. Mechanical Engineering/Integrated Module preparation for upcoming CD-1 (mid-May)
    1. SCROD Rev B/board-stack 3D mechanics  (Matt A)
    2. Thermal modelling plans
  3. Items for bPID meeting this week
    1. Summary of studies (Mike)  [txt]
    2. Mechanics for  Cosmic Running at Fuji Hall  (Marc)
    3. Update on bench test measurements (Kurtis)
    4. Schedule for upgraded electronics/commissioning @ KEK in "summer"
  4. CDR updates  (Gary/Tom/Kurtis)
  5. Future:
    1. Major push on beam test data analysis/additional cosmic running
    2. Another beam test...
    3. Review schedule together
  6. AOB?

5-MAR-2012  iTOP meeting  (2-3pm)

  1. Mechanical Engineering/Integrated Module preparation for upcoming reviews (Tom/Marc/Matt)
    1. Concept drawings of electronics?
    2. Thermal modelling?
  2. Items for bPID meeting this week (ongoing T-1019 analysis)
    1. Laser studies (Mike)  [PDF]
    2. Update on Nphoton (Gary) [E-log link] : #43
    3. Update on bench test measurements (Kurtis)
  3. Software meeting after this  (Matt B)
  4. CDR updates  (Gary/Tom/Kurtis)
  5. Future:
    1. Major push on beam test data analysis/additional cosmic running
    2. Renewed Cosmic Running at Fuji Hall
    3. Another beam test...
    4. Review schedule together
  6. AOB?
  7. Deferred:  grounding discussion based upon summary

6-FEB-2012  iTOP meeting  (2-3pm)

  1. Mechanical Engineering preparation for upcoming reviews (Tom/Marc)
    1. Mechanical mock-up plans (Matt, Kurtis away...)
    2. Concept drawings of support/housing sealing (Jim F.)  [prism1]   [prism_detail]
    3. FEA analysis
  2. Items for bPID meeting this week?
    1. Specifications for mirrors/wedges
    2. Update on beam test analysis...
  3. Further Observations on the T-1019 data  [E-log link] (Mike)
  4. Software meeting after this  (Matt B)
  5. WBS updates PNNL (Gary)
  6. Future:
    1. Major push on beam test data analysis/additional cosmic running
    2. Another beam test...
    3. Review schedule together
  7. AOB?

30-JAN-2012  iTOP meeting  (2-3pm)

  1. Mechanical Engineering preparation for upcoming reviews (Tom/Marc)
    1. Mechanical mock-up?
    2. Need concept drawing of support/housing sealing
    3. FEA analysis to be performed by Metal Technology Inc.  of  [these structures?]
  2. Observations on the T-1019 data (Mike)
  3. Software meeting tomorrow  (Matt B)
    1. Specs table to work -- and expanded list [link]
    2. Are all topics covered?
    3. Do we have a schedule that gets us through various reviews?
  4. Items for bPID meeting this week?
    1. Specifications for mirrors/wedges
      1. Photon losses at window [staric example]
      2. closeout frame versus window  [Ushiroda example]
      3. Step-facet the window?  [Alan sketch]
    2. Update on beam test analysis...
  5. Feedback from WBS Meetings at PNNL (Gary)
  6. AOB?
  7. Deferred:
    1. Another beam test...
    2. Review schedule together

9-JAN-2011  iTOP meeting  (2-3pm)

  1. Laser anomolies in the T-1019 data (Mike)
  2. Software meeting tomorrow?  (Matt B away)
  3. Belle II Trigger/DAQ meeting here [Jan. 16-18]
  4. Plans for Director's Review (anon)
  5. Another beam test...
  6. Next bPID meeting?

28-NOV-2011  iTOP meeting  (2-3pm)

  1. Latest updates in the Beamtest/MC comparison saga (Mike)
    1. Laser degradation during run?  [txt]
    2. Comparison plots  [pdf]
  2. BPAC summary notes  [txt]  (Gary)
  3. Software meeting  (Matt B)
  4. T-1019 preparations (Gary)
  5. Plans for Director's Review (1/3 technical, 2/3 budget & schedule)

21-NOV-2011  iTOP meeting  (2-3pm)

  1. Latest updates in the Beamtest/MC comparison saga  [pdf]   (Mike)
  2. Software meeting deferred -- due to meeting at KEK (Matt B)
  3. T-1019 preparations (Gary)
  4. Plans for Director's Review (1/3 technical, 2/3 budget & schedule)

14-NOV-2011  iTOP meeting  (2-3pm)

No meeting this week due to BPAC, BGM, GBC, B2GM


7-NOV-2011  iTOP meeting  (2-3pm)

  1. Latest updates in the Beamtest/MC comparison saga [run 310 timing] (Mike)
  2. Software/BPAC figures update [ repository ]  (Matt B)
  3. T-1019 preparations (Gary)
  4. BPAC practice talks @ 2pm tomorrow   [review link]
  5. Various travel upcoming...  (all)
  6. WBS 2.0 (integration/commissioning) update needed (in preparation Director's Review)
  7. AOB?

31-OCT-2011  iTOP Halloween meeting  (2-3pm)

  1. Latest updates in the Beamtest/MC comparison saga  (Mike)
  2. Software meeting @ ????  tomorrow (Matt B)   [link]
  3. T-1019 preparations (Gary)
  4. bPID Meeting @ 2pm tomorrow  [link]
  5. Nagoya integration update and plans?  (Matt A in Nagoya)
  6. SciFi tracker opto/electro/mechanics updates (Marc)
  7. BPAC preparations  (all)  [review link]
  8. Various travel upcoming...  (all)
  9. WBS 2.0 (integration/commissioning) update needed (in preparation Director's Review)
  10. AOB?

24-OCT-2011  iTOP meeting  (2-3pm)

  1. Latest updates in the Beamtest/MC comparison saga  (Mike)
  2. Software meeting @ 3pm tomorrow (Matt B)   [link]
  3. Nagoya integration update and plans?  (Matt A en route Wednesday to Nagoya)
  4. Access window update (Inami)  [pdf]
  5. SciFi tracker opto/electro/mechanics updates (Marc/Gary)
  6. BPAC preparations  (all)  [review link]
  7. Various travel upcoming...  (all)
  8. T-1019 preparations (Gary)
  9. An issue from the quartz RFP (qualifying the optics)
  10. WBS 1.3 (electronics) update;  WBS 2.0 (integration/commissioning) update needed
  11. AOB?


17-OCT-2011  iTOP meeting  (2-3pm)

  1. Latest update in the Beamtest/MC comparison saga  (Mike)
    1. Channel numbering issue?   [txt]
    2. Slides  [pdf]
  2. Software meeting @ 3pm tomorrow (Matt B)   [link]
  3. Nagoya integration update?
  4. Items for Wednesday's bPID meeting?
    1. Update on 2010 beam test MC/data comparison  (Mike)
    2. US/CosRay simulation update  (Matt B)
    3. Electronics update  (Matt A?)
    4. T-1019 update  (Gary)
  5. Response due by Oct 25 to Access window questions for ODHM:
    1. Suzuki-san's message  [txt]
    2. Link to last ODHM  [link]
    3. Kohriki-san's drawing  [pdf]
    4. IDS backward view   [pdf]
  6. SciFi tracker opto/electro/mechanics update (Gary)
  7. BPAC preparations  (all)  [review link]
  8. T-1019 updates (Gary)
  9. Estimate of optics assembly effort (v0.2)  [docx]   [pdf]
  10. AOB?

10-OCT-2011  iTOP meeting  (2-3pm)

  1. Latest in the Beamtest/MC comparison saga [72.5 degree incident angle]  (Mike)
    1. Description text  [txt]
    2. MC-data comparison Plots   [pdf]
  2. Software meeting @ 3pm tomorrow (Matt B)   [link]
  3. Nagoya integration  (Kurtis/Matt/Marc)
    1. Kurtis report [pdf]
    2. Action items (elec):
    3. Action items (mech)?
    4. Next round integration deployments
  4. SciFi tracker electro/mechanics, schedule (Gary/Marc)
  5. T-1019 updates (Gary)
  6. AOB?

3-OCT-2011  iTOP meeting  (2-3pm)

  1. Previous Beamtest/MC comparison update (Mike)
    1. Description text  [txt]
    2. MC-data comparison Plots   [pdf]
  2. Software meeting @ 3pm tomorrow (Matt B)   [link]
    1. Couldn't make it today -- but link for tomorrow provided
    2. root file from Matsuoaka-san providing measured QEs for PMTs, to input into simulation
    3. Matched values to be used in MC once tube positions known (make request to fix during Wednesday's meeting?)
  3. Nagoya integration push de-brief (Marc/Matt A)
    1. Integration mechanics (Marc)  [pdf]
    2. First go at Thermal Management  (Marc)  [pdf]
    3. Update from Nagoya  [pdf]
  4. SciFi tracker electro/mechanics, schedule (Gary/Marc)
  5. Integration -- one more time ...-->  YES.  Travel requests sent.
  6. What to present on Wednesday?
    1. Mechanics update  (Marc)
    2. Electronics update  (Matt A/Kurtis)
    3. US software development (Matt B)
    4. T-1019 preparations  (Gary)

  7. Beam test preparations

  8. AOB?

 12-SEP-2011  iTOP meeting  (2-3pm)

  1. Software meeting @ 3pm tomorrow
  2. Mechanics for readout, expansion block support and mounting (Marc)
  3. SciFi tracker electro/mechanics (Gary/Marc)
  4. Integration schedule discussion (all)
  5. AOB?

[NOTE unusual date]     6-SEP-2011  iTOP meeting  (2-3pm)

  1. Software meeting @ 3pm today
  2. Usual suspects for Thursday 3:30pm iTOP meeting with Nagoya? (Gary)
    1. Analysis update (Mike)
    2. Mechanical update (Marc)
    3. Electronics update/schedule (Kurtis/Matt A)
    4. Simulation for CosRay test (Matt B)
    5. Anything else?  (e.g. SciFi update(?) Gary)
  3. Mechanics for readout, expansion block support and mounting (Marc)
  4. SciFi tracker electro/mechanics (Gary/Marc)
  5. Integration schedule discussion (all)
  6. US firmware meeting w/PNNL this Friday (depart 1 week thereafter)
  7. AOB?

29-AUG-2011  iTOP meeting

  1. Software meeting tomorrow (prep?)
  2. Mechanics for readout, expansion block support and mounting (Marc)
  3. SciFi tracker electro/mechanics (Gary/Marc)
    1. Overall design
    2. Schematics
    3. Layout
  4. Integration schedule discussion (all)
  5. US hw/fw meeting this Friday (Gary)
  6. AOB?

22-AUG-2011  iTOP meeting

  1. Software meeting tomorrow (prep?)
  2. Short summary/synopsis of system test [pdf]   (Matt/Kurtis)
  3. Interleaved commissioning schedule  (Gary)
  4. Preparations for bPID meeting on Thursday
    1. Electronics update/schedule  (Kurtis/Matt)
    2. Update on beam test plans for Fermilab  (Gary)
    3. Photonics assembly package, mounting plans/issues  (Marc)
  5. Review of mechanical discussions at Nagoya  (Gary)
  6. Review of further information regarding FTBF tables, iTOP exoskeleton  (Gary)
  7. Detailed design issues discussion  (Marc, all interested:  must end by 3pm)
Follow-up/continuation electro-mechanical discussion at 4pm as needed.  

9-AUG-2011  Mechanical meeting follow-up documentation  

  1. Quartz Bar Box overview diagram  [PNG]
  2. Quartz Bar Box assembly (dated 12-JUL-2010)  [PDF]
  3. Inner Detector Support/TOP Module I/F (dated 27-AUG-2010)  [PDF]
  4. Concept for seam strip bracket/Framing between QBBs (10-AUG-2011)  [PDF]

1-AUG-2011  Mechanics/Beam Test Tracking meeting  (2:00 - 3:00 pm)

  1. Short Review of the existing Kohriki CAD (Marc)  [PDF]
  2. SciFi/hodoscope plans (Gary)  [PDF]
  3. Beam test mechanical fixture (Marc)  [PDF]
  4. AOB?

26-JUL-2011  Software meeting  (2:00 - 3:00 pm)

Dial-in information:  (866) 740-1260  (toll free USA, Canada)

        Access code:  8147808  (followed by "#") 
  1. Further look at TDC distributions (Mike)  [PDF]   [Text]
  2. Documentation for Geant4 simulation (Matt B)  [Text] (updated 2011/07/27)   [G4iTOP_20110727.tar.gz]
  3. Specific action items for next meeting?

19-JUL-2011  Software follow-up meeting  (2:00 - 3:00 pm)

  1. Further look at TDC distributions (Mike)  [PDF]
  2. Comparison of MC of propagation time (Kurtis)  [PDF]
  3. Additional slides (Matt B)  [PDF]
  4. Questions from Gocha?
  5. Specific action items for next meeting?

18-JUL-2011  Local mechanical/electrical meeting  (2:00 - 2:30 pm)

  1. Update on status of Nagoya system test preparations (Kurtis/Matt A)
  2. Mechanics preparation for beam test (Marc)
  3. Discussion on ground rules for Wednesday's "FINAL REVIEW" mechanics meeting with CDC (Marc, all)  [PDF]
  4. SciFi development/discussion (Gary/Marc)  -- separate discussion

Software/simulation/analysis meeting  (2:30 - 3:00 pm)

Dial-in information:  (866) 740-1260  (toll free USA, Canada)

        Access code:  8147808  (followed by "#") 

  1. Charges to this [PDF] group:
    1. Understand previous beam test data (match MC/data)
    2. Study reconstruction algorithms
    3. Optimize final detector configuration:
      1. mirror parameters (Yang)
      2. expansion wedge length, taper
      3. wavelength filter
    4. DOE review anticipated questions:
      1. Characterize Belle II performance with only dE/dx PID?
      2. At what background level (random) do we get into trouble?
      3. Sensitivity to "coherent" (temporal/spatial) background photons?
      4. At what minimum photon level do we fall off a cliff in terms of performance?
    5. Generate 2011 detector MC to guide beam test plan
    6. Cosmic ray MC/data check (BPAC - Nov. 11-12 timescale)
    7. Match detector MC/data from Fall 2011 beam tests (CD-1 review timescale -- early Feb. 2012)
  2. Update on Fall 2010 analysis (Mike)     
    1. Description [txt] 
    2. And plots  [PDF]
  3. Discussion on division of labor from dedicated PID meeting in Nagoya (all) : detector-wide list  [PDF]
  4. Update on GEANT4 simulation effort (Matt B)   [PDF]
  5. Choice of time for regular version of this meeting? --> try 2pm (HST) on Tuesdays [5pm PDT, 8pm EDT]
  6. AOB?


July 4th, 2011  B2GM postings  

  1. Draft iTOP trigger summary slides  [ppt]   (Gary for all)
  2. Update on beam test data analysis  [pdf]  (Mike)


20-JUN-2011  Local meeting  (2:00 - 3:00 pm)

  1. CERN beam test data analysis status (Mike) 
  2. Brief report on Simulation status and plans (Matt B)
  3. Update on board stack testing (Matt A)
  4. Electronics documentation update (Kurtis/Gary/all)
    1. System description document [link]
    2. BLAB3A datA sheet   [link]
    3. SCROD firmware svn on google code [link]
  5.  What can have by B2GM/dedicated PID meeting (July 8-11)
    1. Full electronics module?  (I leave Friday)
    2. Calibration optical fibers -- fiber part number? 
    3. HV cables -- cable follow-up
    4. DC power cables -- choose cable
    5. Cooling pipes -- choose ID/OD
  6. Beam test additional info posted (Gary)
  7. Gantt Chart review (Kurtis)
  8. July and autumn scheduling plans discussion
  9. AOB?

31-MAY-2011  Local meeting  (2:00 - 3:00 pm)

  1. CERN beam test data analysis status (Mike)
    1. Today's plots  [PDF]
    2. Still no response from Arita-san to queries of 27-MAY
  2. Ongoing board designs:
    1. More SCROD boards?
    2. 3x ASIC motherboards
    3. Front boards
    4. HV board
  3.  What can have by B2GM/dedicated PID meeting?
    1. Full electronics module
    2. Calibration optical fibers -- fiber part number? 
    3. HV cables -- choose cable
    4. DC power cables -- choose cable
    5. Cooling pipes -- choose ID/OD
  4. Gantt Chart Update
  5. July and autumn scheduling
  6. AOB?

23-MAY-2011  Local meeting  (2:00 - 2:30 pm)

  1. Report from Japan (Tom)
  2. SL10's (16 channel) from Nagoya: 3x mock-up, 1x functional
  3. Ongoing board design:
    1. 3x ASIC motherboards
    2. Front board
    3. HV board
  4. Carryover from previous discussion on mechanical mock-up:
    1. What can have by B2GM/dedicated PID meeting?
    2. Calibration optical fibers -- fiber part number? 
    3. HV cables -- choose cable
    4. DC power cables -- choose cable
    5. Cooling pipes -- choose ID/OD
  5. July and autumn scheduling
  6. CERN beam test data analysis status (Mike) [pdf]
    1. Update on discussion w/ Arita-san re: time resolutions
  7. AOB?

16-MAY-2011  Local meeting  (2:00 - 2:30 pm)

  1. Report from Japan (Tom)
  2. information on delivered PMTs (Inami-san [txt])   [PDF]
  3. Update on mechanical mock-up -- what input still needed?
    1. What can have by B2GM/dedicated PID meeting?
    2. Complete 3x other boards (Louie):
      1. Rest of carrier Stack (Levels 2-4) [layout done -- awaiting test]
      2. HV card  [start soon]
      3. Front card  [Matt to coordinate?]
    3. Calibration optical fibers -- fiber part number? 
    4. HV cables -- choose cable
    5. DC power cables -- choose cable
    6. Cooling pipes -- choose ID/OD
  4. July and autumn scheduling  [link]
  5. CERN beam test data analysis status (Mike)
    1. Reply from Arita-san  [txt]
    2. Relevant plots  [PDF]
  6. AOB?

9-MAY-2011  Local meeting  (2:00 - 3:00 pm)

  1. Report from Japan (Tom)
  2. b-PID meeting this week
    1. update on Nov 2010 beam test analysis (Suzuki, Jones)
    2. progress towards autumn 2011 beam test:
      1. PMTs (Inami)
      2. electronics (Hawaii)
      3. mechanics (Hawaii)
      4. quartz (Horii)
    3. response from Kohriki-san to electronics mechanical proposal (Suzuki)
    4. radiation test summary (Koga)
    5. quartz specifications confirmation (Inami, Shwartz)
  3. Plans for mechanical mock-up -- what still needed?
    1. Complete 3x other boards (Louie):
      1. Rest of carrier Stack (Levels 2-4) [layout done -- awaiting test]
      2. HV card  [start soon]
      3. Front card  [Matt to coordinate?]
    2. Calibration optical fibers -- choose fiber? 
    3. HV cables -- choose cable
    4. DC power cables -- choose cable
    5. Cooling pipes -- choose ID/OD
  4. July and autumn scheduling
  5. CERN beam test data analysis status (from 2:30pm, when Mike available)
    1. 9-MAY-2011 analysis update [link]
  6. AOB?

2-MAY-2011  Local meeting  (2:00 - 3:00 pm)

  1. Updates on funding (Tom)
  2. Plans for mechanical mock-up -- what still needed?
    1. Complete 3x other boards (Louie):
      1. Rest of carrier Stack (Levels 2-4) [layout done -- awaiting test]
      2. HV card  [start soon]
      3. Front card
    2. Calibration optical fibers -- choose component? 
    3. HV cables -- choose cable
    4. DC power cables -- choose cable
    5. Cooling pipes -- choose ID/OD
  3. b-PID meeting this week?  (golden week?)
    1. SCROD testing update
    2. Status of rest of cards
    3. Gantt update
    4. Anything new mechanics
  4. July and autumn scheduling
  5. CERN beam test data analysis status (from 2:30pm, when Mike available)
  6. AOB?

18-APR-2011  Local meeting  (2:00 - 3:00 pm)

  1. Review SuperBEAST WBS  (Sven lead)
    1. spreadsheet  [xlsx]
  2. Plans for mechanical mock-up -- what still needed?  (Marc lead discussion)
    1. Complete 3x other boards:
      1. Rest of carrier Stack (Levels 2-4)
      2. HV card
      3. Front card
    2. Calibration optical fibers? 
    3. HV cables
    4. DC power cables
    5. Cooling pipes
  3. What to present at b-PID meeting this week?
    1. SCROD testing update
    2. Status of rest of cards
    3. Gantt update
    4. Anything new mechanics
  4. CERN beam test data analysis status (from 2:30pm, when Mike available)
    1. Brief summary  [txt]
    2. Further queries to Suzuki-san?

6-APR-2011  Board Stack Design Review  (10:30 am HST)

Cross-talk measured by Mike:  details  [txt]   plot:  [PDF]

Submission Review for 3 boards (SCROD-based readout):

  1. BLAB3A ASIC card
    1. Schematic  [PDF]
    2. Layout  [PDF]
  2. ASIC "carrier" card
    1. Schematic  [PDF]
    2. Layout  [PDF]
  3. Interface card
    1. Schematic  [PDF]
    2. Layout  [PDF]
  4. Submission schedule?

4-APR-2011  Local meeting  (2:00 - 3:00 pm)

  1. Plans for mechanical mock-up?  (Marc lead discussion)
    1. Calibration optical fibers? 
    2. HV cables
    3. DC power cables
    4. Cooling pipes
  2. Review WBS structure (1.3) and updates [4-APR-2011]
    1. Summary WBS spreadsheet (Jim Fast):  Option 3:  [xls]   Option 4:  [xls]
    2. Readout Electronics (David Asner):  Option 3:  [xls]   Option 4:  [xls]
  3. B2GM meeting this week??
  4. CERN beam test data analysis status (from 2:30pm, when Mike available)
    1. Fit results  [PDF]
    2. Further queries to Suzuki-san (for which no response received)  [txt]
  5. Next time -- BEAST2 WBS review

30-MAR-2011  Special WBS meeting  (1:00 - 3:00 pm)

WBS Section 1.3 (Readout Electronics):

  1. US Belle II WBS overview diagram  [PDF]
  2. Hawaii Labor rates basis:  [xls]
  3. Summary WBS spreadsheet (Jim Fast):  Option 3:  [xls]   Option 4:  [xls]
  4. Readout Electronics (David Asner):  Option 3:  [xls]   Option 4:  [xls]

28-MAR-2011  Local meeting  (2:00 - 3:00 pm)

Preparation for WBS Review on Wednesday is highest priority.

  1. Plans for mechanical mock-up?  (Marc lead discussion)
    1. Calibration optical fibers? 
    2. HV cables
    3. DC power cables
    4. Cooling pipes
  2. Review WBS structure (1.3) and solicit electro-mechanical input
  3. CERN beam test data analysis status (from 2:30pm, when Mike available)
    1. Fit results  [PDF]
    2. Further queries to Suzuki-san (for which no response received)  [txt]
  4. Continue and fill Section F (cost estimates -- continuing later afternoon as needed), summary Spreadsheet

25-MAR-2011 Readout WBS meeting  (1:00 - 3:00 pm)

WBS dedicated discussion in the IDL (Gary and Kurtis), with the following reference documents:

  1. US Belle II WBS overview diagram  [PDF]
  2. Summary WBS spreadsheet (Jim Fast) original: [xls]   IDL modified (option 3):  [xls]   IDL modified (option 4):  [xls]
  3. Readout Electronics (David Asner) original:  [xls]   IDL modified (option 3):  [xls]   IDL modified (option 4):  [xls]

BPAC Draft Report (v2)  [PDF]

21-MAR-2011 Local meeting  (2:30 - 3:30 pm)

 
1) First pass at Schedule/WBS
  1. Link to original file from Jim Fast:  [xls]
  2. Discussion of items:
    1. Step 1: 
      1. Getting task list correct
      2. Consider tasts that are specific elements of work and have durations of 1 week to 2 months
      3. Level of effort tasks are generally not to be used
      4. Consider milestones as well.  These will go in at 0 days duration and will be linked, generally, to completion of some other task
    2. Step 2:
      1. Put appropriate resources on each task (at lowest level in WBS).
      2. Equipment and materials should go in with dollars, e.g. Equipment[5000].
      3. Labor should be listed with specific people names if possible and then number of hours required to do the work on the specific task
  3. Assignments:
    1. 1.2.1 PNNL
    2. 1.2.2 Alan (suspect will need a LOT of help)
    3. 1.2.3 Gary
    4. 1.2.4 Leo
    5. 1.2.5 Leo
    6. 1.2.6 Giovanni
    7. 1.2.7 Sven
  4. Modifications:
    1. Highlight new rows inserted and provide information regarding predecessors and successors (i.e. how does this new task fit in the flow of work)
  5. Upcoming meetings ?  (mechanical this week?)  Confirm next B-PID?
2) Update on getting data sets from Nagoya?  (Mike)

3) Follow-up from last PID meeting on reflections at glue joints:
  1. Overall note on background photons in the DIRC:  BaBar Note 141  [PDF] 
    1. Conclusions:  scintillation unimportant, delta-ray production dominates, with glue joint reflections of second-most importance
    2. Underlying basis is measurements made in Note 140
  2. Specific measurements of reflection from Epotek joints:  BaBar Note 140   [PDF]
    1. Note wavelength dependence
    2. Non-Fresnel deviations seen


7-MAR-2011 Local meeting  (2:30 - 3:30 pm)

1) Follow-up discussion from last mechanical meeting
  1. Marc on what is actual incursion?  [PDF]
2) Update on getting data sets from Nagoya?  (Mike)

3) Follow-up discussion from last PID meeting
  1. Fuji hall "clean room" clean enough for bar & bar-box assy?
  2. Probably need space for electronics outside?  (CR test stand to be outside?)
  3. Stages and jigs?
  4. Gluing procedures?  [coordination with Cincinnati?]
4) Revised (Inami-san) schedule for 2011  [PDF]
  1. Action item to revisit readout module preparedness Gantt Chart
    1. Commissioning with radiator should start end of July
    2. Several Belle II production (not R&D) SL-10 ready by April
    3. 8 MCP-PMT ready by middle of April
  2. Concrete proposal for a CERN beam test  [PDF]
  3. Started a [link] of items related to our preparations for this [2011 iTOP beamtest]
5) Exhibits for the Ground Breaking Ceremony, next B2GM ??  (Discussion)
  1. needs to be before 3/18 ?? (for GBC)
  2. on exhibit in Tsukuba Exhibition after GBC?
  3. can hand-carry to April B2GM
6) DOE pow-wow March 15 in DC (no meeting next week?) -- additional information needed?  (Tom/Gary/Sven)


Follow-up from meeting:  Kohriki drawing  [PDF]


28-FEB-2011 Local meeting  (Mike teaches until 2:30pm)

1) Reports from Belle II meeting at SLAC
  1. Marc on mechanics (post-SLAC meeting)  [PDF]
  2. Critical issues -- DOE proposal/meeting March 15
  3. Schedule discussion (all)
  4. Revised cost estimate  [xls]
2) Update on getting data sets from Nagoya?  (Mike)
==> no response from Suzuki-san...

24-JAN-2011 No Regular meeting -- (Marc, Matt, Kurtis & Gary @ KEK)

1) A collection of pictures from the TOF dismount/repurpose (Jan 2011)   [link]

2) Report from Yamaoka-san on the sag of the ECL (as measured on flanges)  [PDF]

3) Design Review at KEK (Jan 22, 2011)  [txt summary]     [IDM figure]  [size XLS]   [size PDF]
       Conclusion is a request for 3mm variance of the 10mm buffer zone. 
Action items:
  1. Screw intrusions into buffer zone to be requested from Kohriki-san
  2. A more comprehensive cabling drawing is needed
4) Status at KEK:
  1. all TOF counters successfully moved to Fuji clean room area
  2. HV and cables being assembled
  3. First generation readout of 64 TOF channels possible with CREAMTEA module (Matt will work on during his stay)
  4. Cut fiber optics need to be re-terminated; lengths to be confirmed
  5. Geometry and support for the TOF counter configuration to be optimized 
5) Proposal by Inami-san for arrangement of the Fuji Hall space  [PDF]


17-JAN-2011 No Regular meeting -- MLK holiday (though many in for imminent departure)

1) Report from Uehara-san at the Monday morning (KEK) meeting on TOF extraction   [PDF]

2) Report from Mike on studies of cosmic rays with Belle TOF, indicating that 4cm RMS might be a realistic input value.

Data set:  cosmic skim for Exp. 73, runs 849-916.

Posted file:  [PDF]

Description:   Plot 1 shows the counter number distribution and plot 2 shows the delta t distributions. 

Because of the way the event T0 is
determined, hits in one TOF counter will result in dT near 0 and the dT in the opposite counter will be near either -8 ns (top half) or 8 ns (bottom half of detector). 

Plots 3-4 show delta Z
versus zhit and the delta Z distribution respectively.  For these plots delta Z is the calculated z position (using the TDC values for backward and forward PMTs) minus the zhit value
determined by extrapolation of the track to the TOF. 

One can
see in plot 4 that the RMS is about 4 cm.

10-JAN-2011 Regular meeting

1) Report from Marc on initial thoughts on TOF counter configuration/support  [PDF]

2) Initial simulation studies of optimizing geometry/layout of Fuji Hall CRT  [PDF]

3) Schedules for being at KEK:

Marc's schedule:  Arrive KEK on the evening of Tue Jan 18th, depart afternoon of Fri Jan 28th.

Gary:  arrive KEK evening of 21-JAN, depart NRT evening of 24-JAN
(25-26 JAN Trg/DAQ @ IHEP/Beijing, 28 JAN USTC/Hefei, 1-6 FEB  Nanjing, 7-11 FEB  SNU/Seoul)

Matt (KEK support):   Jan 20 - Feb. 4

Kurtis:     Jan 19 - Jan 24

4) Schedules for rest of year -- Discussion

e.g.  Gary to visit PNNL Friday;  BGM/B2GM  April 6-10

5)  AOB?


27-DEC-2010 In lieu of meeting -- updated 31-DEC-2010:

Revised drawing (Marc)  [jpg]  and  zoomed-in dimensioned view  [jpg]

--> First thoughts on bar configuration (Marc)  [PDF]

==> Gary comments: 

  1. can consider not close-packing the bars
  2. use 96 = 6 layers above and below, 8 bars/layer
  3. final geometry needs study

20-DEC-2010 Somewhat irRegular meeting (not all hands...)

1) Schedules for being at KEK

Marc's schedule:  Arrive KEK on the evening of Tue Jan 18th, depart afternoon of Fri Jan 28th.

Gary:  arrive KEK evening of 21-JAN, depart NRT evening of 24-JAN
(25-26 JAN Trg/DAQ @ IHEP/Beijing, 28 JAN USTC/Hefei, 1-6 FEB  Nanjing, 7-11 FEB  SNU/Seoul)

Matt (KEK support) -- dates

2) Cosmic test stand design concept/plans

3) Response to Uehara-san's message

4) discussion on preparations and equipment for gluing -- visit to Zygo?

5)  AOB?


13-DEC-2010 Regular meeting

1) Schedules for being at KEK

Marc's schedule:  Arrive KEK on the evening of Tue Jan 18th, depart afternoon of Fri Jan 28th.

Gary:  arrive KEK evening of 21-JAN, depart NRT evening of 24-JAN
(25-26 JAN Trg/DAQ @ IHEP/Beijing, 28 JAN USTC/Hefei, 1-6 FEB  Nanjing, 7-11 FEB  SNU/Seoul)

Matt (KEK support) -- dates?    (Kurtis?)  

2) Draft talk for PHENIX on DIRC detectors (Gary/Kurtis) (version 10)   [PDF]
    Draft talk for PHENIX on LAPPD/electronics (Kurtis)

3) Schedules for rest of year
       --> There will be a meeting next week [link below]

4)  AOB?

For next time:  discussion on preparations and equipment for gluing -- visit to Zygo?


6-DEC-2010 Regular meeting

Follow-up information (posted 7-DEC):
  1.  on TOF Modules best for experimenting upon (Mike Jones)  [txt]
  2. Last set of HV bias settings for the tubes (Uehara-san)  [txt]

1) Updated schedule for TOF removal (from Uehara-san, for discussion)  [PDF]

2) Details on coupling of the suspension belts/brackets to TOF mounts (Kichimi-san figure)   [PDF]

3) Schedules for being at KEK?

Marc proposal:  Arrive KEK on the evening of Tue Jan 18th, depart afternoon of Fri Jan 28th.

Matt match?    (Kurtis?)      Gary (en route to IHEP/USTC/Korea....)

4) Plans for configuring the TOF bars/PMTs/readout.  Including fiber optic/laser calibration system.  Reminder of existing bar structure  [PDF]

5) Straw-man proposal for a possible configuration (to be optimized -- only 64 counters shown)  [PDF]

6) How much of E-Hut electronics to keep??   Electronics/E-hut overview  [PDF]
    Itoh-san's message on clean-up rules   [txt]



 Notes from Kichimi-san on instructions for dismounting/dismantling TOF   [PDF]   (posted 24-NOV-2010)

Follow-up video meeting on Dec. 7th (Hawaii)/Dec. 8th KEK?

22-NOV-2010 Regular meeting

0) Belle II TDR available

1) Summary from Belle II  B-PID   [PDF]   (Gary)

2) TOF dismounting plans discussion    (all)

Message from Uehara-san:

 Roll Out            Dec.9
 Removing cables   Dec.28-30, (and also in January?)
 (Extraction of CDC,BACC      Jan.4-19)
 Exraction of TOF  Jan.20-26

Who, what, where, why and when ??

3) Plans for cosmic test stand at Fuji ?   (all)

4) Beam test at CERN? -- feedback     (Gary)

5) 2011 preview of coming attractions     (Gary)

Jan 25-26  B2 Trigger/DAQ in China
Feb ??   BAM/BAS
Apr 5-11  BGM/B2GM/Official commencement ceremony

6) AOB?   (all)


8-NOV-2010 Regular meeting

1) Preparations for presentations next week  [all]
    a) readout update  [Kurtis/Matt/Gary]
    b) mechanics update (incl. electro-mech/board stack)  [Marc/Gary]
    c) others?
2) Discussion of what to do once Zygo bars received?  [all]

3) BLAB3 firmware update: status & plans [Kurtis/Matt/Gary]

4) Revised schedule for KEK/Nagoya installation/test trip (Feb/Mar 2011 ?) [Matt/Gary/Kurtis]
- dates for CERN beam test?
- existing or new board stack? (BLAB3 vs BLAB3A vs IRS2 w/amps)
- SL-10 PMT production test stand

5) AOB? [all]

25-OCT-2010 Regular meeting

0) 26-OCT-2010 -- Follow up on suggestion to check if other times 12x channels of ADC are zeros:

Thanks for the reply. I've checked ADC values for the other
modules and found
adc1 - 1206 events with all 12 ADC values =0
adc2 - 83 events with all 4 ADC values =0
adc3 - 13 events with all 12 ADC values =0
adc4 - 1 event with all 8 ADC values =0

It seems that whatever causes the zero ADC values is mostly on
the adc1 module.
If you make root files in the same format for the upcoming
CERN beam test, I would like to look at them.


1) Latest on Nagoya TOP counter analysis [Mike]

Message to Inami-san (21-OCT-2010):
 
Today I made a new nhit plot after modifying your script to
require for each channel

50<tdc[j] && tdc[j]<3000 && adc[j]>80 && adc[j]<500

where adc[j] is the ADC value for channel j.

The new plot is mdjnhitadclt500.ps. [PDF]

I added the adc[j]<500 requirement
because I had seen previously (plots c53.ps and c55.ps) that
some channels had a much broader distribution of adc values
for nhit=36 and nhit=24 without the adc[j]<500 requirement.
The mdjnhitadclt500.ps plot has nhit distributions with
veto (red histogram) and without veto (blue histogram) which
smoothly approach zero for nhit>30. In particular, there is
no peak at nhit=36. This could indicate that ADC values
above 500 are due to some kind of noise which somehow affects
all channels.


Further Message to Inami-san (22-OCT-2010):
 
Today I made a new nhit plot requiring for each channel
50<tdc[j] && tdc[j]<3000 && adc[j]>80 to calculate nhit.

The plot is mdjnhitadcanom.ps. [PDF]

The upper histogram is for events with at least one non-zero
ADC value among the 1st four channels
[(adc1_1+adc1_2+adc1_3+adc1_4)>0]. The lower histogram is for
1206 events for which (adc1_1+adc1_2+adc1_3+adc1_4)==0. The
lower histogram has no entries for nhit>24 because all 1206
events have the ADC values equal zero for the next eight
channels (adc1_5 through adc1_12). I checked one event
(evtnum==26) for which the 1st 12 channels have ADC values
equal zero and found that the TDC values look normal. Are
you aware of any anomaly which causes the 1st 12 channels
to have adc=0? Are these 12 channels read out with the same
electronics module?

Additional plots not sent (25-OCT-2010)

"event displays" for 4 events:

TDC vs. channel [run80ev3.ps] [PDF]

ADC vs. channel [run80ev3adc.ps] [PDF]

Event 26 is plotted with square symbols. The ADC values are zero
for channels 1-12.


2) Mechanics update [Marc]  
a) beam test
b) mechanical mock-up
c) discussion on recent news [Tom/Gary]

3) Beam test at CERN/B2GM scheduling [Gary]

4) Overview of test cards/systems/new ID Lab system [Gary]
- [PDF]

5) BLAB3 firmware status & plans [Kurtis/Matt]

6) Revised schedule for KEK/Nagoya installation/test trip (beginning Jan 2011) [Matt/Gary/Kurtis]

7) AOB? [all]


18-OCT-2010 Regular meeting
1) Anything further on Nagoya TOP counter analysis [Mike]

Message to Inami-san (18-OCT-2010):
 
I made some plots to investigate the veto counter adc
distributions as a function of nhit. I used my modified script which requires
50<tdc[j] && tdc[j]<3000 && adc[j]>80
for each channel to calculate nhit. The plots c66.ps through
c70.ps show the veto adc versus nhit+evtnum/17000 with various cuts
on the number of veto counters with adc>80.

c66.ps veto counter 1 adc5_5>80||adc5_6>80 3853 entries [c66.pdf]
c67.ps veto counter 1 adc5_5>80 2631 entries [c67.pdf]
c68.ps veto counter 2 adc5_5>80||adc5_6>80 3853 entries [c68.pdf]
c69.ps veto counter 2 adc5_6>80 2399 entries [c69.pdf]
c71.ps veto counter 1 adc5_5>80&&adc5_6>80 1173 entries [c71.pdf]
c70.ps veto counter 2 adc5_5>80&&adc5_6>80 1173 entries [c70.pdf]

A common feature of all these plots is a clear excess at
adc>4000 for nhit=36 and a smaller excess at adc>4000 for nhit=24.
Do adc values > 4000 indicate very large pulse heights or do they indicate no data? If adc values > 4000 indicate
very large pulse heights, why is there an excess for nhit=24 but not for
nhit values between 25 and 35?


2) Mechanics update (?) [Marc] (will be away?)

3) Beam test at CERN? [Gary]

4) Overview of test cards/systems/new ID Lab system [Gary]
- [PDF]

5) BLAB3 firmware status & plans [Matt]

6) Revised schedule for KEK/Nagoya installation/test trip (beginning Jan 2011) [Matt/Gary/Kurtis]

7) AOB? [all]



11-OCT-2010 Regular meeting time

1) Further Update on cosmic ray data analysis of the Nagoya TOP counter prototype [Mike]

Response from Inami-san received. Made the change suggested

The resulting script is inami1005a.C in ~mdjbelle at KEK.

The plot I obtained using this script is [inamiringcolor.ps] [PDF]

I also modified this script so that I could apply a cut

if(50<tdc[j] && tdc[j]<3000 && adc[j]>80) h2->Fill(j,tdc[j]);

The modified script is inami1005b.C and the plot is [inamiringcuts.ps] [PDF]

I had noticed earlier that some channels have many fewer entries than typical channels and made some
plots of nhit comparing individual channels.

Plot [c61.ps] [PDF] compares the channel with tdc14_3 (upper histogram) with that
for channel with tdc14_1 (lower histogram).

Plot [c63.ps] [PDF] compares the channel with tdc13_3 (upper histogram) with that
for channel with tdc13_4 (lower histogram).

A large fraction of the 2106 entries for channel tdc13_4 are due to events with nhit=36.

2) Updates on the mechanics [Marc]
- beam components status
- mechanical mock-ups (required input/component ordering) [GSV/Louie will look into]

3) BLAB3 firmware status & plans [Matt]

4) Revised schedule for KEK/Nagoya installation/test trip (beginning Jan 2011) [Matt/Gary/Kurtis]

5) Feedback from Detector R&D Workshop [Gary]

6) Priority items? [all]

7) AOB? [all]

28-SEP-2010 Follow-up on TOP Cosmic Results:

To Inami-san:  I made some plots to check the possible cross talk which could produce the two narrow, parallel bands along the diagonal of the TDC correlation plots which I made earlier.  For these studies I use two adjacent channels (tdc15_4 & tdc15_5) in the PMT which shows the most prominent TDC correlation and a different PMT (channels tdc14_3 & tdc14_4) with only a faint TDC correlation.
The striking difference is the concentration with ADC values below 80 in plots c44.pdf and c45.pdf which is not present[ed] in the plots for the other PMT.  This seems to confirm that small ADC values are associated with most of the anomalous TDC correlation.

Perhaps one should require ADC values greater than 80 for studies using TDC values.

Subsequent plots to try and understand what is going on for these events where all of the PMT channels are hit:

  1. Applying this cut:  [mdjnhitadcgt80.pdf]
  2. For tdc15_5  (anomolous TDC correlation)   [c48.pdf]
  3. For tdc14_14 (normal)   [c49.pdf]
  4. Corresponding plots for ADC versus nhit+(evtnum/17000) for two channels  [c53.pdf]  and  [c55.pdf]

27-SEP-2010 (back to regular meeting time of 3pm)

0) Any updates/news from Japan/KEK?  [Tom/Sven]

1) Update on report on cosmic ray data analysis of the Nagoya TOP counter prototype [Mike]
2) Updates on the mechanics [Marc] slides [PDF]
- beam components status
- mechanical mock-ups (required input/component ordering) [GSV/Louie will look into]

3) BLAB3 firmware status & plans [Matt]

4) Revised schedule for KEK/Nagoya installation/test trip (beginning Jan 2011) [Matt/Gary/Kurtis]

5) Priority items? [all]

20-SEP-2010 (again, special short meeting -- 2:30-3pm)

With Tom, Sven at KEK and Kurtis remaining in an undisclosed location, the meeting should be relatively short, 
do look forward to hearing from Mike on analysis of cosmic ray data, as well as status report from Marc about
the beam test stand mechanical preparations.

1) Report on cosmic ray data analysis of the Nagoya TOP counter prototype [Mike]
2) Updates on the mechanics [Marc] 
- beam components status
- mechanical mock-ups (required input/component ordering)

Marc had to go home due to sick kid, report via e-mail:
To be discussed.

3) BLAB3 firmware plans [Matt]

4) Priority items? [all]

13-SEP-2010 (special short meeting -- 2:45pm)

1) Updates on the mechanics [Marc]  [PDF]
- beam components status
- mechanical mock-ups (required input/component ordering)

2) BLAB3 firmware plans [Matt]

3) Priority items? [all]

7-SEP-2010 (archive)

1) No meeting this week due to intensive meetings last

2) Beam test preparations [all]
- post Kurtis' Gantt for weekly review
- available personnel
- status of expected performance

3) Updates on the mechanics [Marc]
- test beam configuration
- mechanical mock-ups

4) Plans for the next couple of months...

6) Visits:
- Matt 9/30 - 10/17 (& Mike with some overlap) thereafter

7) AOB?


Archival information:

List of dedicated PID meeting (early September 2010) in Honolulu attendees  [link]

0) PID micro-group meeting from 3pm

1) Review of "final" detector configuration meeting (5/17) [Gary]
- what still remains?
- "2 weeks" to freeze

2) Final TDR revisions [based upon Review] (5/23 & 5/24)
Due 6/16!!
Uno/Haba-san comments [PDF] [docx]

3) Plans for full DOE proposal -- Due 7/1!! [Gary for Tom]

4) HI-TIDE HV/LV power options [Marc]

5) Summer schedule and discussion (building toward Nov beam test)
- mechanical mock-up
- BLAB3 module commissioning
- data processing development

6) AOB?


Deferred update items:

i) Final Simulation/reconstruction plans [Kurtis/all]

ii) mechanics/electronics packaging [Marc/???]

Reference Material:

For DOE proposal preparation (or perhaps later), a set of reference documents on costing
may be found in the /costing directory. A sample document for LBNE costing [PDF].


A note from Ushiroda-san on how to submit a Belle II note, with a direct [link]

There is a Trigger/DAQ meeting in between an earlier AMBER meeting and
the regular iTOP/bPID, which covers issues related to triggering and data
transfer/handling.

Mike Jones study of TS stretch factor/pedestal [Exp 57] [Exp 71]

Compiled TOF timing studies [Mike]
- Belle Note 1146 [PDF] [gs]
- Recent Timing studies [PDF] [gs]
- timing (T0) [Mike]

TDR {current}
(Wiki repository)

Trigger/DAQ (after AMBER)

== Original TDR_v0.1 draft needs work TDR working page [all]
== Link to previous TDR source: [working directory]
== Message from Mike on timing studies with exiting TOF [20-FEB-2010/mdj]

Nov 2010 CERN beam test data  [link]  


further documentation on actual beamtest info  [link]

Archive (snapshots):

Draft BPAC Beamtest/electronics talk  [PDF]




Return to scheduling page
[UH Physics] [University of Hawaii]
Last modified: 2/14/2016 -- GSV