point for items identified as missing from budget
This list captures items discussed that need to be covered in
some way for the Belle II iTOP and KLM detectors, but isn't
currently in US budget.
List of item:
- 2x 6U VME crates [for TOP and KLM trigger]
- Additional TOP UT3 trigger boards (x2?)
- VME CPUs (x2) for UT3 management in each of above crates
- DC power supplies [iTOP: 3V/4V/5V]
- DC power cabling (from E-hut to TOP modules pig-tail)
- HV power cabling (from E-hut to TOP modules pig-tail)
- BPM RF-over fiber TX and RX & optical fiber for TOP
collision monitoring
- Calibration/timing box for TOP:
- Arb. Function generator mode
- RF sine cal signal mode
- BPM signal mode
- KLM crate CAT-7 cables and fiber optic cables (short cables)
- Fiber cable runs (COPPER <-> patch panel (E-hut)
<-> KLM crate/TOP cable couplers
- AC power control (network monitor/control for remote reboot)