Ice
Radio
Sampler
--
test
&
evaluation
page
23-FEB-2011
(HST/24-FEB-2011
Taiwan)
Meeting
Agenda
- Items related to year 2 Station design [link]
- Testing update: (Chiu-Chuan)
[PDF]
- IRS customs release? (all)
- Testing plans -- discussion
- In addition to a couple chips for eval testing in Hawaii, Ohio
State (Patrick Allison) has requested a couple to test with year 2
readout prototype
- What to prepare by the time of the Collaboration meeting (2 weeks
from now).
- AOB?
12-JAN-2011
(HST/13-JAN-2011
Taiwan)
Meeting
Agenda
- Testing update: (Chiu-Chuan)
[PDF]
- IRS customs release? (all)
- Testing plans -- discussion
- In addition to a couple chips for eval testing in Hawaii, Ohio
State (Patrick Allison) has requested a couple to test with year 2
readout prototype
- AOB?
5-JAN-2011
(HST/13-JAN-2011
Taiwan)
Meeting
Agenda
- Meeting not held -- but update sent: (Chiu-Chuan)
[PDF]
22-DEC-2010
(HST/23-DEC-2010
Taiwan)
Meeting
Agenda
- Testing update: (Chiu-Chuan)
[PDF]
- IRS fabrication status (Gary)
- Latest check, a bit confusing as MOSIS projected has 2 dates
listed: 23-DEC-2010 and 03-JAN-2011
receipt
at
MOSIS
- In addition to a couple chips for eval testing in Hawaii, Ohio
State (Patrick Allison) has requested a couple to test with year 2
readout prototype
- AOB?
8-DEC-2010
(HST/9-DEC-2010
Taiwan)
Meeting
Agenda
- Further testing of firmware? (Chiu-Chuan)
[PDF]
- Update on dT calibration?? (Ming-Yuan)
[to be
posted]
- NTU slides on IRS testing summary (last 2 weeks?) [to be posted]
- Hawaii calibration (LAB3 data) updates (Rishi/Andres/Kurtis)
[link]
- IRS fabrication status (Gary)
- Latest check: 20-DEC-2010
receipt
at
MOSIS
- Bonding diagram for 84280 (IRS2) posted 10-DEC-2010 [PDF]
- In addition to a couple chips for eval testing in Hawaii, Ohio
State (Patrick Allison) has requested a couple to test with year 2
readout prototype
- AOB?
1-DEC-2010
(HST/25-NOV-2010
Taiwan)
No
Meeting
held,
but
update:
- Update on a calibration technique (Ming-Yuan)
[PDF]
24-NOV-2010
(HST/25-NOV-2010
Taiwan)
Meeting
Agenda
- Timing strobe adjustment resolution (Chiu-Chuan)
[PDF]
- Update on dT calibration?? (Ming-Yuan)
[to be
posted]
- NTU slides on IRS testing summary (last 2 weeks?) [to be posted]
- Correlated sample calibration method update? (Kurtis)
[to be
posted]
- IRS fabrication status (Gary)
- Last check still cliaming 15-DEC-2010 receipt at MOSIS
- For reference, BLAB3A shipped yesterday
- Status of BIS 711 form?
- Gary away (Poland 11/27 - 12/2) --> defer next week's
meeting ??
- AOB?
10-NOV-2010
(HST)
Meeting
Agenda
Items:
- Equalizer board received -- some initial (and nice) results:
- S21 [PDF] raw
data file [prn]
- S11 [PDF] raw
data file [prn]
- S21 delay [PDF]
raw
data
file
[prn]
- Updated NTU slides on IRS testing:
- Timing issues? (Chiu-Chuan)
[PDF]
- First shot at dT calibration (Ming-Yuan)
[to be posted]
- Some pointers to calibration papers (updated 11-NOV-2010):
- "Time-Interleaved Analog-to-Digital converters: Status
and future directions" by C. Vogel and H. Johansson. A review paper
that mentions the existing approaches. [PDF]
- "Efficient Calibration of Time-Interleaved ADCs via Separable
Nonlinear Least Squares", by J.Xu and T. Strohmer. [PDF]
- "TIME-INTERLEAVED ANALOG-TO-DIGITAL CONVERTERS FOR DIGITAL
COMMUNICATIONS", by Tsai, Hurts, Lewis [PDF]
- "Calibration of sample-time error in a two-channel
time-interleaved analogto-digital converter" by Jamal, Singh, hurst
Lewis [PDF]
- "Blind Adaptive Equalization of Mismatch Errors in Time
Interleaved A/D Converter System", by Elbornsson,
Gustafsson [PDF]
- IRS2 in fab queue [late December??]
- Gary away (KEK 11/14 - 11/21) --> defer next week's
meeting ??
- AOB?
3-NOV-2010
(HST)
Meeting
Agenda
Items:
- Update on shipping date for Equalizer
prototypes and IRS_eval boards to Hawaii.
- Requested NTU slides on IRS testing:
- Measured waveform timing issue (Chiu-Chuan)
[PDF]
- First shot at dT calibration (Ming-Yuan)
[PPT]
- Correlated sample calibration method (Kurtis)
[link]
- IRS2 in fab queue (awaiting confirmation of tape-out), submitted:
[Nov. 1]
- AOB?
27-OCT-2010
(HST)
Meeting
Agenda
Items:
- Update on shipping date for Equalizer
prototypes and IRS_eval boards to Hawaii.
- Requested NTU slides on IRS testing [PDF]
- Planned submission -- PO update?: [Nov. 1]
- AOB?
13-OCT-2010
(HST)
Meeting
Agenda
Items:
- Update on shipping date for Equalizer
prototypes and IRS_eval boards to Hawaii.
- Update on IRS2 design:
- Two remaining technical
issues:
- Have all problems been
identified? (testing at NTU of full readout?)
- IRS2 enqueued!
- Requested NTU slides on IRS testing [nothing sent]
- Planned submission: [Nov. 1]
- AOB?
29-SEP-2010
(HST)
Meeting
Agenda
Items:
- Update on shipping date for Equalizer
prototypes and IRS_eval boards to Hawaii.
- Update on IRS2 design:
- Design review held "today"
Wednesday, Sept. 29th
- Two remaining technical
issues:
- Have all problems been
identified? (testing at NTU of full readout?)
- Extract of layout
requires a PC with >= 32 GigaBytes RAM (I'm working on it --
PC on order)
- Requested NTU slides on IRS testing [PDF]
- Possible submission deadlines [Oct 4, Nov. 1, Nov.
15]
- Update on TrigRate/Threshold study
(time permitting) [PDF]
- AOB?
15-SEP-2010
(HST)
Meeting
Agenda
&
Action
Items:
- Requested via e-mai: status of
the Equalizer
design/prototype in FR-4, based upon material presented
- Slides from Chih-Ching (9-SEP-2010) [PDF]
- Melin's slides on Trigger simulation [PDF]
- ANITA Note on Rician statistics (how to estimate proper
signal-to-noise for radio receivers) ANITA Note #68 [PDF]
- Reference information for how simulation estimates done
previously (ANITA Note #4) [PDF]
- Requested NTU slides on IRS testing [PDF]
- Continued Dialog on proposed timetable
- Next possible IRS2 submission deadlines [Oct 4, Nov. 1, Nov.
15]
8-SEP-2010
(HST)
Meeting
Agenda
Items:
- Requested from Peter (from earlier ARA Meeting): status of
the Equalizer
design/prototype?
- Requested NTU slides [PPTX]
[PDF]
- Follow-up upon question: posted information for the
IRS_eval:
- Layout files [.pcb] [Gerbers]
- Schematic files [.sch] [PDF]
- Discussion on proposed timeline
- (TARGET2
ASIC in design queue ahead of...)
- AOB?
Testing
task list:
- Evaluation board design
- Baseline control firmware
- Usual sampling/timing stuff
- Actual resolution/performance
- Recent documentation:
- DOR API (Kael) [PDF]
- Extremely useful set of IceRay era files (Hagar) [link]
- TRACR Programming (Hagar) [link]
- Additional info: JTAG boundary scan {XSVF
generation/flasher IF} -- (John Kelley) [link]
- Archive server copy of IceCube DAQ/Timing [PDF]
- Detailed RapCal write-up [ps]
- IceRay (1.8km) Cable documentation (Bob M.) [PDF]
- Comment from Bob M. on cable breakout/pins [txt]
- Cable emulator documentation:
- 3km cable emulator [PDF]
- Quad cable simulator [PDF]
- Cable emulator parts [PDF]
- ICRR schematics [PDF] (CF ARA
ELOG #17)
- USB interface board schematics [PDF]
- DOR card driver (Hagar 14-MAY-2010) [rpm]
- Schedule reference (Albrecht 22-APR-2010) [PDF]
- kick-off meeting Indico [webpage]
- ASIC of reference: IRS design [homepage]
- IceRay Testing Reference (John Kelley)
- IceRay Integration visit [website]
- Flasher board [link]
- Mini how-to document [PDF]
[return
to
task
and
schedule
homepage]
[UH Physics] [University of Hawaii]
Last modified: 2/19/2011