completed tasks:
- IRSX schematic pdf conversion to pngs and a linked TOC page to see each png
- sort through PC cables and organize them (use velcro to separate individual cables)
- sort other PC components (keyboards, mice, CDROM drives, ethernet cards, video cards, video cables, USB cables, ethernet cables, etc)
- have someone put the rest of the PADS pseudo-carrier schematic together
- check LPDDR2 pinout against SCROD revB schematic
- label carrier13 boards with serial numbers
- move red magazines to back hallway
- make an 8-way SHV breakout box
- make some 1.5m cat6 cables for the meeting table
- make another mechanical mockup with walls to send to Gerard
- sort new screws in big plastic bin and put them in short plastic bins
- sort computer cables into bins
- fix soldering on power cables that Grace made
- check Paul's new WBS against our change requests
- organize anti-static boxes and ASIC carriers and put them somewhere
- engrave new equipment (oscilloscopes, function generators, power supplies, GPIB, hand tools)
- engrave three lab chairs
- label all carrier02 revD boards and put them in a plastic bin
- sort pages for IRSX (including creation of a ToC)
- put together parts kit for c13 revD
- re-wire lab with 8 port gigabit switches (one more to go here; need to wait for shipment)
- vacuum back room and tidy up workbench
- type up things written in liner notes for cost book / WBS
- assemble two lab chairs
- put together 4 mockups and cut out foam in a platt case to fit them