iTOP
Commissioning page
The iTOP Detector is now
installed. Much effort was involved to reach this
point. Now need to actually make work!
18-APR-2017 Meeting
- IRSX ASIC testing/paper update (Oskar) [10']: [link?]
- TOP Readout Electronics update (Dmitri) [10']: [link?]
- What still needed on Multi-hit FW (Luca)
- Status and plans for Slow Control/Config (Tobias)
- Next round of Data Taking, Debugging at KEK (All)
- FW Bootcamp preparation items:
- Contact DAQ group with plans
- Move HLT to B2 TOP area
- Network config
- Belle II SS attendance?
- AOB [topics for next week?]
31-OCT-2016 Meeting
- IRSX ASIC final testing/paper (Oskar) [10']
- TOP Readout Electronics (Dmitri) [10']
- Plans for debugging/data analysis (All)
- Pedestal data with different averaging
- AOB [topics for next week?]
26-SEP-2016 Meeting
- IRSX ASIC final testing/paper (Oskar) [10']
- TOP Readout Electronics (Dmitri) [10']
19-SEP-2016 Meeting
- IRSX ASIC final testing/paper (Oskar) [10']: [plots_persistance.root]
- TOP Readout Electronics (Dmitri) [10']: [link?]
- Latest tbc processing (Gary) {will go through some}
- Plans for debugging/data analysis (All)
- AOB [topics for next week?]
12-SEP-2016 Meeting
- IRSX ASIC final testing/paper (Oskar) [10']
- TOP Readout Electronics (Dmitri) [10']
29-AUG-2016 Meeting
22-AUG-2016 Meeting
- TWiki->Confluence web pages/updates (Tobias) [10']:
[to
be added]
- IRSX ASIC final testing/paper (Oskar) [10']: [link]
- TOP Readout Electronics (Dmitri) [10']: [to
be added]
- TOP Debugging schedule discussion (Gary) [20']
- AOB [topics for 8/29 -> 8/30?]
Archive:
Return
to scheduling page
[UH Physics] [University of Hawaii]
Last modified: 7/10/2018