4-JAN-2010 Action items list

Prioritized List:

  1. Marc iTOP power (voltage div) [iTOP meeting] -- Discussed: baseline now 4x HV cables
  2. Show schedule to Marc for piLas [iTOP meeting] -- bracket machined -- first measurements taken
  3. Timing diagram for BLAB3/IRS sampling/readout [Gary]
  4. Digikey parts order (ASAP) [Jim] -- FEL order requirements (Jan)
    1. link to FEL order docs[Gary]
    2. link to FEL req order (.xls) template
  5. Check with Jan on Finn student [Gary] -- nominally March 3rd (could be delayed)
  6. Check on laptop orders [Larry] -- Jan followed-up: expected to arrive 19-JAN
  7. STURM2 package/pin-out [Gary/Jim] -- [schematic] [chip layout]
  8. xFEL clock divide down? [Gary] -- forgot to ask (12-JAN PI meeting)
  9. System timing diagram [Gary/Larry] -- defer until next week
  10. Talk with Josie about student lab postings [Jim]

Deferred actions:

  1. Signal generators?
  2. New scope?


Last modified: 1/9/2010 -- GSV