Prioritized List:
- Marc iTOP power (voltage div) [iTOP meeting] -- Discussed: baseline now 4x HV
cables
- Show schedule to Marc for piLas [iTOP meeting] -- bracket machined -- first measurements
taken
- Timing diagram for BLAB3/IRS sampling/readout [Gary]
- Digikey parts order (ASAP) [Jim] -- FEL order requirements (Jan)
- link
to FEL order docs[Gary]
- link
to FEL req order (.xls) template
- Check with Jan on Finn student [Gary] -- nominally March 3rd (could be delayed)
- Check on laptop orders [Larry] -- Jan followed-up: expected to arrive
19-JAN
- STURM2 package/pin-out [Gary/Jim] -- [schematic]
[chip
layout]
- xFEL clock divide down? [Gary] -- forgot to ask (12-JAN PI meeting)
- System timing diagram [Gary/Larry] -- defer until next
week
- Talk with Josie about student lab postings [Jim]
Deferred actions:
- Signal generators?
- New scope?
Last modified: 1/9/2010 --
GSV