Minutes from today's meeting. I spoke to Tobiyama, and added his reply about the BPM issue to the minutes. STURM meeting minutes 2010.4.23 1) Expected kakenhi budget: 2010: 200 man-yen 2011: 120 man-yen 2012: 30 man-yen Pending final approval, money should start being available in June. 2) Resolution plots for CesrTA 3) ATF: Gary at KEK Windows: 5/18-21, 5/31-6/2 (maybe) 4) No more rad testing needed. 5) Belle timing jitter: Correlation plots show jitter between Belle's copy of RF clock and bunch collision time is <~15 ps. Need BPM signal near IP to compare with Belle clock. May want a special purpose BPM in future for timing measurement. *Checked with Tobiyama. OCTPOS BPM signals are available at Tsukuba B4. *If special BPM is needed for Belle-II, something could be arranged in the Tsukuba straight section. Best to get that request in as soon as possible so it can make it into the design. 6) Gary 5/17-5/24 @ KEK for sure 7) Sample from Lightspin?