From john.flanagan@kek.jp Tue Sep 7 18:02:36 2010 Date: Wed, 08 Sep 2010 13:14:14 +0900 From: John Flanagan To: Gary S. Varner Cc: John Flanagan Subject: Minutes 2010.9.8 Hi Gary, Some notes. --John ------------------------------------------------------- Minutes 2010.9.8 1. Report on ATF2 beamline construction [John] 1. -->Extraction line surveyed in, beam pipe beign put together (JF, Mitsuhashi, Naitoh) 2. -->Have to do some work on wiring up vac. pump + sensor + valve 3. -->Want to get a quote for polished Be window, as current one has rough surface. 2. Update on Fermionics procurement/mounting plans [Gary] 1. -->Fermionics will epoxy down sensor, Optomech will "print" traces. Need angled board to attach to detector (UH machine shop). 2. -->Lightspin: practicing wirebonding, will also have Optomech print for later versions. 3. Confirmation of specs for next generation readout [discussion] 1. 64 vs. 128 readout channels? 1. -->128 for this year, with goal of 256 by the time SuperKEKB comes on (256 will require custom charge-sensitive amplifier, to be developed from next year.) 2. -->ATF needs 64 @ 50 um pitch, or 128 @ 25 um pitch 3. -->SuperKEKB needs 128 50 um pitch, or 256 @ 25 um pitch 2. 3 board types? 1. sensor board (Optomec traces to breakout connector) 2. Intermediate amplifier card 3. STURM2-based readout (includes FPGAs/USB/fiber link) 1. -->All sounds good. Swappable amp card may be handy for dyn. range tweaking. 3. Needed gain? (60dB) 1. -->60+ dB overall gain, with attenuators between stages. 4. ROE2 back-end? (electrically similar, but higher density) 1. -->Gary considering ways to re-use UH XFEL back-end 5. Manpower? [may have to muscle and do myself...] 4. STURM2 further firmware development 1. -->Will discuss further next week (JF will study VHDL more, and poke around more). 5. AOB? 1. -->Possible postdoc (depending on his interest), would start in December at earliest if he decides to join XRM project. 2. -->Belle General Meeting 15-20 Nov. (Gary->KEK) (2010年09月08日 10:34), Gary S. Varner wrote: Hi John, Great, thanks; have posted, along with a draft Agenda: http://www.phys.hawaii.edu/~idlab/taskAndSchedule/STURM/STURM.html talk with you in about 1.5 hours. Cheers, Gary On Wed, 8 Sep 2010, John Flanagan wrote: Beam line taking shape. (Keitai pic, so not so great quality). -------- Original Message -------- Date: Wed, 08 Sep 2010 09:49:46 +0900 From: To: john.flanagan@kek.jp