
|
Report No. |
Author(s) |
Title |
Date |
|
|
|
|
|
|
DIR-1-83 |
Matsuno, S. |
Simulation on the DUMAND String and the Muon String by Use of SNAPLD Program |
April 1983 |
|
DIR-2-83 |
Stenger, V. |
Not so Grim Results of Imaging Gamma Ray Monte Carlo Events |
June 1983 |
|
DIR-3-83 |
Stenger, V. |
Monte Carlo Studies on the Efficiency, Energy Threshold and Angular Resolution of the Mt.Hopkins Gamma Ray Telescope |
July 1983 |
|
DIR-4-83 |
Roberts, A. |
Preliminary Ideas on In Situ Testing of Optical Properties of the SPS |
July 1983 |
|
DIR-5-83 |
Roberts, A. |
Effect on Sensitivity of Blue Cutoff Filter to Eliminate Bioluminescence |
July 1983 |
|
DIR-6-83 |
Gorham, P. |
PMT Anode Current Measuring Considerations For the DUMAND Prototype Module |
August 1983 |
|
DIR-7-83 |
Stenger, V. |
How Much Can We Improve Sensitivity of |
September 1983 |
|
DIR-8-83 |
Stenger, V. |
Comparing Gamma Ray Monte Carlos Shower Data is Like
Comparing Apples and |
September 1983 |
|
DIR-9-83 |
Stenger, V. |
Experimental Note on 16 PMT Tests |
September 1983 |
|
DIR-10-83 |
Stenger, V. |
Teravolt Astronomy: COSPAR/IAU Symposium on Advances in High Enrgy Astrophysics and Cosmology |
September 1983 |
|
DIR-11-83 |
Matsuno, S.: |
16” |
October 1983 |
|
DIR-12-83 |
Roberts, A. |
Proposed Method for Obtaining Amplitude Data in Multiple Muon Events |
October 1983 |
|
DIR-13-83 |
O'Connor, D., Matsuno, S. et al. |
Calibration of the Photomultipliers Used for Measurement of Bioluminescence Background DUMAND |
|
|
DIR-14-83 |
Lewitus, Alan |
Physical Oceanographic Data from the DUMAND Site |
|
|
DIR-15-83 |
O'Connor, D., et al. |
Background and Bioluminescent Light Levels at the DUMAND Site |
|
|
DIR-1-84 |
Stenger, V. |
|
January 1984 |
|
DIR-2-84 |
Learned, J. |
Sound Velocity and Variations at DUMAND Site |
March 1984 |
|
DIR-3-84 |
O'Connor, D. et al. |
Calculations of the Angular Acceptance of a Photomultiplier in a Cylinderical Baffle Mounted in a Sphere Immersed in Water |
March 1984 |
|
DIR-4-84 |
Wilkins, G |
Power/Strength Tradeoffs for 6.35mm Deepsea E-O Tether |
June 1984 |
|
DIR-5-84 |
Wilkins, G. |
Another Round of Power/Strength/Diameter Tradeoffs |
July 1984 |
|
DIR-6-84 |
Dye, S. |
|
June 1984 |
|
DIR-7-84 |
Roberts, A. |
Heat Loss Through the Benthos Sphere |
October 1984 |
|
DIR-8-84 |
Rangan, K. |
Results from Purdue K-40 Experiment |
|
|
DIR-9-84 |
Dye, S. |
A Preliminary Assessment of the Effects of an Aluminum SBC Pressure Housing on the Dynamics of the SPS |
November 1984 |
|
DIR-10-84 |
Stenger, V. |
Yet Another Imaging Algorithm |
December 1984 |
|
DIR-1-85 |
Stenger, V. |
A Comparison of Underground Neutrino Event Rate Calculations |
May 1985 |
|
DIR-2-85 |
Stenger, V. |
Ersatz Expectations |
November 1985 |
|
DIR-1-86 |
Matsuno, S. |
Results on Optical Module Calibration |
July 1986 |
|
DIR-2-86 |
Stenger, V. |
SPS Expectations |
|
|
DIR-3-86 |
Learned, J. |
Convective Cooling by Gases |
October 1986 |
|
DIR-4-86 |
Learned, J. |
Calibrating the SPS in the Ocean with the Laser |
|
|
DIR-5-86 |
Stenger, V. |
Determination of Water Attenuation from SPS Calibration Runs |
November 1986 |
|
DIR-6-86 |
Stenger,V. |
Demon, Trical and Decal: the SPS Onboard Analysis Programs |
|
|
DIR-1-87 |
Learned, J. |
Post Mortem of SBC Fast Electronics |
January 1987 |
|
DIR-2-87 |
Stenger, V. |
The Bottom-Moored String |
May 1987 |
|
DIR-3-87 |
Matsuno, S. |
The Angular Time Delay of |
August 1987 |
|
DIR-4-87 |
Learned, J. |
Array Specifications for Next Stage of DUMAND |
December 1987 |
|
DIR-5-87 |
Becker-Szendy, R. |
Report on Preliminary Analysis of Environmental Data |
|
|
DIR-1-88 |
Matsuno, S.: |
A Manual of SPS Event Display Program EVPLT |
June 1988 |
|
DIR-2-88 |
Stenger, V.: |
Muon Astronomy in the Sea |
|
|
DIR-1-89 |
Roberts, A. |
DUMAND Checklist |
April 1989 |
|
DIR-2-89 |
Stenger, V |
The |
August 1989 |
|
DIR-1-90 |
Harris, D., Roberts, A. |
The DUMAND Power Supply Problem |
March 1990 |
|
DIR-2-90 |
Roberts, A. |
Shall We Duplex C2 and C3? |
March 1990 |
|
DIR-3-90 |
Roberts, A. |
Array Expansion |
March 1990 |
|
DIR-4-90 |
Roberts, A. |
Regulator Design |
March 1990 |
|
DIR-5-90 |
Roberts, A., Learned, J. |
Design of Junction Box EM Package |
April 1990 |
|
DIR-6-90 |
Roberts, A. |
Summary of Changes in 11/89 DUMAND Specs as of |
April 1990 |
|
DIR-7-90 |
Roberts, A., Learned, J. |
Emergency |
April 1990 |
|
DIR-8-90 |
Stenger, V.J. |
Response of Octagon to Fermilab Neutrinos |
July 1990 |
|
DIR-9-90 |
Stenger, V.J. |
Preliminary Results on the Effect of Digitizer Least Count on Pointing Error |
July 1990 |
|
DIR-10-90 |
Stenger, V.J. |
MC Results on Low Energy Neutrinos in DUMAND |
August 1990 |
|
DIR-11-90 |
Cavadias, George: |
Time and Frequency Control in the DUMAND Array |
|
|
DIR-12-90 |
Learned, J.G.: |
Triggering in DUMAND |
|
|
DIR-13-90 |
Ekstrom, Phil: |
Brief Regarding String Clocks |
|
|
DIR-14-90 |
Okada, A. and Uehara, S. |
Pulse Height Distribution of a |
|
|
DIR-15-90 |
Wilkins, George |
Specification for: 36-km-long, Deepsea, Electro-optical, Communication Cable |
|
|
DIR-16-90 |
Wilkins, George |
Specification for Four 9.2-km-long Opto-mechanical tubes for Deepsea Electro-optical Seafloor Cable |
|
|
DIR-17-90 |
Van Ryzin, Joe |
Progress, DUMAND Site/cable study |
|
|
DIR-18-90 |
Stenger, V.J. |
Optical Module Simulation |
|
|
DIR-19-90 |
Learned, Okada and Uehara |
Estimating the Total Energy Trigger Rate in DUMAND II |
(Pub in |
|
DIR-20-90 |
Aoki, T. and |
Digital Circuit for Optical Module |
|
|
DIR-21-90 |
Kawamota, H., |
Circuit with New Output Pulse Structure for JOM |
|
|
DIR-1-91 |
Dye, S., Hazen, E.S. |
Computer Simulation of the Strawman Digitizer for the DUMAND II Experiment |
|
|
DIR-2-91 |
Hazen, E.: |
DUMAND SBC Fast Digitizer Design Report |
|
|
DIR-4-91 |
Hayashino, T.: |
Light Emission Check from Back Direction of |
|
|
DIR-5-91 |
Stevenson, M.L. |
A Simple Functional Form for the Reno- Quigg (Anti)Neutrino Total Cross Sections |
|
|
DIR-6-91 |
Wilkes, R.J., Egaas, B. and McCourry, L. |
Hydrophone Cable Crosstalk Tests |
DUMAND-UWA-91-1 |
|
DIR-7-91 |
Wilkes, R.J. |
Environmental Module for DUMAND: Design and Deployment DUMAND-UWA-91-2 |
|
|
DIR-8-91 |
Goodman, et al |
on FNAL beam |
|
|
DIR-9-91 |
Stevenson, M.L. |
|
|
|
DIR-10-91 |
Clem, John and Webster, Med |
|
|
|
DIR-11-91 |
Learned, J.G. |
Using the DUMAND Optical Module Hardhat as a Lens to Increase Light Collection |
|
|
DIR-12-91 |
Stevenson, M.L. |
A Gallery of Muon Trajectories and Their Cherenkov Arrival Times at the Optical Modules of DUMAND II |
|
|
DIR-13-91 |
Learned, J.G. |
DUMAND II System Description |
|
|
DIR-14-91 |
Learned, J.G. |
DUMAND II Specifications |
|
|
DIR-15-91 |
Stenger, V.J. |
How to Calculate the Undersea Muon Flux Produced by Very High Energy Neutrinos |
|
|
DIR-16-91 |
Stenger, V.J. |
Fake Events in DUMAND II |
|
|
DIR-17-91 |
E. Hazen, E. Gergin, A. Mavretic. |
DUMAND SC Digitizer ASIC Specification. |
|
|
DIR-18-91 |
B. Egaas. |
Viewgraphs on An Acoustic Survey System for DUMAND II |
|
|
DIR-19-91 |
B. Egaas. |
In-Air Chirping Test |
|
|
DIR-20-91 |
B. Egaas. |
Frosh Pond Chirp Test |
|
|
DIR-21-91 |
B. Egaas. |
|
|
|
DIR-22-91 |
Jose M. Andres (Makai Ocean Engineering Inc.). |
Results from deployment simulations of DUMAND Strings. |
|
|
DIR-1-92 |
E. Hazen et al., |
DUMAND String Controller Digitizer System Design Specification. |
|
|
DIR-2-92 |
E. Hazen et al., |
DUMAND SC Digitizer ASIC Specification. |
|
|
DIR-3-92 |
Report withdrawn |
|
|
|
DIR-4-92 |
J. Learned |
Initial DUMAND II Deployment Scenario |
|
|
DIR-5-92 |
D.J. Wagner and |
The Detection of |
|
|
DIR-6-92 |
James Pantaleone |
Nue Appearance for 'Numu - Nutau' Ocillations in Matter |
|
|
DIR-7-92 |
J. G. Learned, et al. |
DUMAND II Deployment Strategy Options |
|
|
DIR-8-92 |
|
Alpha-Helix Cruise Report |
|
|
DIR-9-92 |
|
A10360 ULF Cable. Summary of Fiber Break Investigation. |
|
|
DIR-10-92 |
D. Nicklaus. |
DUMAND Archived Data Format Description. |
|
|
DIR-11-92 |
J. Learned. |
Preliminary Report of DUMAND Site Coring from thE R/V Yuzhmorgeologiya |
|
|
DIR-12-92 |
P. Gorham et al. |
Cruise Summary. Moan Wave Operations at the DUMAND Site |
19 Sept. - |
|
DIR-13-92 |
R.J. Wilkes. |
Analysis of CTD and XBT Date from Moana Wave Cruise 1992. |
|
|
DIR-14-92 |
J. G. Learned. |
Preliminary Report of DUMAND Site Coring from the R/V Yuzhmorgeologiya. |
|
|
DIR-15-92 |
|
Preliminary Analysis of a Deployment Scenario for the DUMAND Cable, Junction Box and the First Detector String. |
Nov., 1992. |
|
DIR-1-93 |
|
Calculation of the Expected Counting Rate and Detection Efficiency of the Hale DUMAND Experiment |
|
|
DIR-2-93 |
J. Barrera, R. Buehler, and E.J. Gnam,
|
Evaluation of KVH C100 Compasses for use in CAL MODS. |
|
|
DIR-3-93 |
A. Okada |
Simulation of JOM Signal Generation and Muon Reconstruction |
|
|
DIR-4-93 |
C. Kuo |
DIVE: DUMAND Interactive Visualising Explorer. |
August 1993. |
|
U. Berson, C. Wiebusch |
EOM Technical Description |
September 1993. |
|
|
DIR-6-93 |
Gary S. Varmer, |
A new mult-hit Time-to-Digital Converter (TDC) ASIC for the Deep Underwater Muon and Neutrino Detector (DUMAND). |
|
|
DIR-1-94 |
R.J. Wilkes |
Transforming GPS to/from UTM Coordinates. |
|
|
DIR-2-94 |
R. J. WIlkes |
CTD Data from the DUMAND Deployment Cruise. |
UWA-DUMAND-94-02 |
|
DIR-3-94 |
R/J. Wilkkes & J. George |
Acoustical Noise Spectrum from DUMAND. |
UWA-DUMAND-94-03 |
|
Christoph Ley and Christopher Wiebusch. |
The Shape of EOM-pulse-height distributons. |
January 1994 |
|
|
DIR-5-94 |
R. Svoboda |
Characteristics of the December 1993 Monster Buffer Data. |
|
|
DIR-6-94 |
C. Wiebusch, D. Engle, T. Mikolajski, O. Streicher |
Plane wave measurements with an EOM. |
|
|
DIR-7-94 |
S. Matsuno |
Some fitting results for the DUMAND Dec '93 data. |
|
|
DIR-8-94 |
S. Matsuno |
SC communication program manual. |
|
|
DIR-9-94 |
Peter Gorham |
Summary Report on an Engineering Review of the DUMAND Trigger Processor. |
|
|
DIR-10-94 |
R.J. Wilkes |
CTD Data from the DUMAND Deployment Cruise. |
|
|
DIR-11-94 |
J. George |
Acoustic data from DUMAND deployment cruise. |
|
|
DIR-12-94 |
Russel Clark |
Noise and Pulse Characteristics of the December 1993 Monster Buffer Data LSU-HEPA-4-94 research memo. |
|
|
DIR-1-95 |
A. Okada |
A mathematical formulation of least squares method for muon track fitting in DUMAND. |
Jan. 1995. |
|
DIR-2-95 |
E. Hazen, et al. |
A New Multi-hit Digital TDC Implemented in a Gallium Arsenide ASIC. |
|