Publications

2005 Publications
Date
Large Analog Bandwidth Recorder and Digitizer with Ordered Readout (LABRADOR) ASIC August 2005
Tuning into the Neutrinos in Antartica - The Anita Experiment March 2005
BESII Detector Simulation March 2005
   

2004 Publications

 
Status of the Belle Silicon Vertex Detector June 2004
The Silicon Vertex Detector for the Super B Factory June 2004
A Belle Pixel Vertex Detector Upgrade: Progress and Plans December 2004
Development of a Super B-Factory Monolithic Active Pixel Detector - the Continuous Acquisition Pixel (CAP) Prototypes July 2004
ANITA Trigger Logic: Estimates of Thermal Noise Trigger Rates and Practical Operating Thresholds .pdf file .ps file May 2004
Draft Evaluation of Giga-bit Ethernet Instrumentation for SalSA Electronics Readout (GEISER) January 2004
   
2003 Publications  
Design and Structure of Upgraded Silicon Vertex Detector at Belle November 2003
The Belle Trigger System with the new Silicon Vertex Detector SVD 2.0 November 2003
The Data Acquisition System of the Belle Silicon Vertex Detector (SVD) Upgrade November 2003
Upgrade of the TOF Trigger Electronics .pdf file .ps file June 2003
Monolithic Multi-channel GSa/s Transient Waveform Recorder for Measuring Radio Emissions from High Energy Particle Cascades April 2003
The Data Acquisition System Based on PMC Bus March 2003
Development of a PCI Based Data Acquisition Platform for High Intensity Accelerator Experiments March 2003
Calibration and Performance of the Belle TOF system January 2003
   
2002 (and Before) Publications  
A Detailed Monte-Carlo Simulation for the Belle TOF System April 2002
Pixel Detectors in a B-Factory Environment and thoughts on use in Belle January 2000
Belle Note 278 .ps file December 1999
Time expanding multihit TDC for BELLE TOF detector at KEK B factory April 1997
Design of the TOF Front End Electronics September 1996
A Proposal for a Front-end Fastbus Module to Process the TOF PMT Signals July 1996
A Scintillating Fiber Hodoscope for a Bremstrahlung Luminosity Monitor at an Electron-Position Collider July 1996
The Cerenkov Correlated Timing Detector: Beam Test Results from Quartz and Acrylic Bars August 1995
A Shift Register Circuit for KLM/RPC Readout (BELLE Note #80) .ps July 1995